Difference between revisions of "Spectrometer"
From Moller Wiki
(→Ongoing Work) |
|||
Line 24: | Line 24: | ||
## Freeze design by February 7th (config 9) | ## Freeze design by February 7th (config 9) | ||
## collimator 5, 6 dimensions needed | ## collimator 5, 6 dimensions needed | ||
+ | ## Envelopes - before end of February | ||
# Dates for upstream 60% Fall 2020? | # Dates for upstream 60% Fall 2020? | ||
# 90% Design (everything!) - CD2/3 Review | # 90% Design (everything!) - CD2/3 Review |
Revision as of 19:40, 1 February 2021
MOLLER Wiki |
MOLLER page |
DocDB |
Project |
Teleconferences |
Bluejeans |
Milestones
- hybrid/segmented downselect - November 15
- collimators (mid- December)
- Review irradiation papers by mid-December
- beam pipes and enclosures - Start mid-February
- 60% Design review to do a prototype (possible spare) March 8th
- Freeze design by February 7th (config 9)
- collimator 5, 6 dimensions needed
- Envelopes - before end of February
- Dates for upstream 60% Fall 2020?
- 90% Design (everything!) - CD2/3 Review
- DirRev - July 2023
- Supports at low radius
Documentation
To be reviewed:
Ongoing Work
- Tolerances
- Physics - Done
- Interference with envelopes - Done
- Doses on coils
- Clean transport to dump
Working Group Members
- Internal Working Group
- Ruben Fair (Project lead)
- Juliette Mammei (collaboration lead)
- External Working Group
- Review Committee Members (as needed)