Hybrid/segmented downselect

From Moller Wiki
Jump to: navigation, search
MOLLER Wiki
MOLLER page
DocDB
Project
Teleconferences
Bluejeans
  1. November 20, December 4th meeting
  2. will meet the week of Nov. 30 to discuss Pugh matrix
  3. Change control board meeting mid-December
  4. prioritize recent blocky models for this
    1. Will new SC4 work cooling water tubes extra 4mm?
  5. remove hump, tail angle - probably not needed right now
  6. Checks for
    1. full distributions (1D and 2D)
    2. optimization of tiles - deconvolution (is this necessary)
      1. use the current optimization of the tiles and run deconvolution code
    3. checking envelopes (probably not necessary for downselect)



Back to Spectrometer