Difference between revisions of "Spectrometer"
From Moller Wiki
Line 35: | Line 35: | ||
# [[Nomenclature document | Nomenclature]] | # [[Nomenclature document | Nomenclature]] | ||
# [[ Radiation dose papers]] | # [[ Radiation dose papers]] | ||
− | # [ | + | # [https://userweb.jlab.org/~kashy/Moller/Beamline%202D%20drawings/ Song sheet] |
== Ongoing Work == | == Ongoing Work == |
Revision as of 19:38, 1 February 2021
MOLLER Wiki |
MOLLER page |
DocDB |
Project |
Teleconferences |
Bluejeans |
Milestones
- hybrid/segmented downselect - November 15
- collimators (mid- December)
- Review irradiation papers by mid-December
- beam pipes and enclosures - Start mid-February
- 60% Design review to do a prototype (possible spare) March 8th
- Freeze design by February 7th (config 9)
- collimator 5, 6 dimensions needed
- Dates for upstream 60% Fall 2020?
- 90% Design (everything!) - CD2/3 Review
- DirRev - July 2023
- Supports at low radius
Documentation
To be reviewed:
Ongoing Work
- Collimator 1+2 merge (Chandan)
- Tolerances
- Physics - Done
- Interference with envelopes - Done
- Doses on coils
- Clean transport to dump
- Optimizing upstream coil shielding (Naz)
Working Group Members
- Internal Working Group
- Ruben Fair (Project lead)
- Juliette Mammei (collaboration lead)
- External Working Group
- Review Committee Members (as needed)