Difference between revisions of "Spectrometer"

From Moller Wiki
Jump to: navigation, search
Line 35: Line 35:
 
# [[Nomenclature document | Nomenclature]]
 
# [[Nomenclature document | Nomenclature]]
 
# [[ Radiation dose papers]]
 
# [[ Radiation dose papers]]
# [[Song sheet]]
+
# [https://userweb.jlab.org/~kashy/Moller/Beamline%202D%20drawings/ Song sheet]
  
 
== Ongoing Work ==
 
== Ongoing Work ==

Revision as of 19:38, 1 February 2021

MOLLER Wiki
MOLLER page
DocDB
Project
Teleconferences
Bluejeans

Milestones

  1. hybrid/segmented downselect - November 15
  2. collimators (mid- December)
  3. Review irradiation papers by mid-December
  4. beam pipes and enclosures - Start mid-February
  5. 60% Design review to do a prototype (possible spare) March 8th
    1. Freeze design by February 7th (config 9)
    2. collimator 5, 6 dimensions needed
  6. Dates for upstream 60% Fall 2020?
  7. 90% Design (everything!) - CD2/3 Review
    1. DirRev - July 2023
  8. Supports at low radius

Documentation

To be reviewed:

  1. Specifications
  2. Nomenclature
  3. Radiation dose papers
  4. Song sheet

Ongoing Work

text
The MOLLER spectrometer in TOSCA
text
Layout of the hybrid torus conductor
  • Collimator 1+2 merge (Chandan)
  • Tolerances
    • Physics - Done
    • Interference with envelopes - Done
    • Doses on coils
    • Clean transport to dump
  • Optimizing upstream coil shielding (Naz)

Working Group Members

  • Internal Working Group
    • Ruben Fair (Project lead)
    • Juliette Mammei (collaboration lead)
  • External Working Group
  • Review Committee Members (as needed)




old wiki