== Milestones == | == Milestones == | ||
+ | |||
# [[hybrid/segmented downselect]] - November 15 | # [[hybrid/segmented downselect]] - November 15 | ||
# [[collimators]] (mid- December) | # [[collimators]] (mid- December) | ||
# [[Review irradiation papers]] by mid-December | # [[Review irradiation papers]] by mid-December | ||
# [[beam pipes and enclosures]] - Start mid-February | # [[beam pipes and enclosures]] - Start mid-February | ||
+ | # 60% Design review to do a prototype (possible spare) March 8th | ||
+ | ## Freeze design by February 7th (config 9) | ||
+ | ## collimator 5, 6 dimensions needed | ||
+ | # Dates for upstream 60% Fall 2020? | ||
+ | # 90% Design (everything!) - CD2/3 Review | ||
+ | ## DirRev - July 2023 | ||
# [[Supports at low radius]] | # [[Supports at low radius]] | ||
+ | |||
== Documentation == | == Documentation == | ||
Revision as of 19:35, 1 February 2021
MOLLER Wiki |
MOLLER page |
DocDB |
Project |
Teleconferences |
Bluejeans |
Milestones
- hybrid/segmented downselect - November 15
- collimators (mid- December)
- Review irradiation papers by mid-December
- beam pipes and enclosures - Start mid-February
- 60% Design review to do a prototype (possible spare) March 8th
- Freeze design by February 7th (config 9)
- collimator 5, 6 dimensions needed
- Dates for upstream 60% Fall 2020?
- 90% Design (everything!) - CD2/3 Review
- DirRev - July 2023
- Supports at low radius
Documentation
To be reviewed:
Ongoing Work
- Collimator 1+2 merge (Chandan)
- Tolerances
- Physics - Done
- Interference with envelopes - Done
- Doses on coils
- Clean transport to dump
- Optimizing upstream coil shielding (Naz)
Working Group Members
- Internal Working Group
- Ruben Fair (Project lead)
- Juliette Mammei (collaboration lead)
- External Working Group
- Review Committee Members (as needed)