Difference between revisions of "Spectrometer"

From Moller Wiki
Jump to: navigation, search
(Documentation)
Line 19: Line 19:
 
# [[collimators]]  (mid- December)
 
# [[collimators]]  (mid- December)
 
# [[Review irradiation papers]] by mid-December
 
# [[Review irradiation papers]] by mid-December
# [[beam pipes and enclosures]] - Start mid-December
+
# [[beam pipes and enclosures]] - Start mid-February
 
# [[Supports at low radius]]
 
# [[Supports at low radius]]
 
== Documentation ==
 
== Documentation ==

Revision as of 19:15, 1 February 2021

MOLLER Wiki
MOLLER page
DocDB
Project
Teleconferences
Bluejeans

Milestones

  1. hybrid/segmented downselect - November 15
  2. collimators (mid- December)
  3. Review irradiation papers by mid-December
  4. beam pipes and enclosures - Start mid-February
  5. Supports at low radius

Documentation

To be reviewed:

  1. Specifications
  2. Nomenclature
  3. Radiation dose papers
  4. Song sheet

Ongoing Work

text
The MOLLER spectrometer in TOSCA
text
Layout of the hybrid torus conductor
  • Collimator 1+2 merge (Chandan)
  • Tolerances
    • Physics - Done
    • Interference with envelopes - Done
    • Doses on coils
    • Clean transport to dump
  • Optimizing upstream coil shielding (Naz)

Working Group Members

  • Internal Working Group
    • Ruben Fair (Project lead)
    • Juliette Mammei (collaboration lead)
  • External Working Group
  • Review Committee Members (as needed)




old wiki