Difference between revisions of "Spectrometer"

From Moller Wiki
Jump to: navigation, search
(Documentation)
Line 26: Line 26:
 
# [[Specifications document | Specifications]]
 
# [[Specifications document | Specifications]]
 
# [[Nomenclature document | Nomenclature]]
 
# [[Nomenclature document | Nomenclature]]
# [https://moller.jlab.org/cgi-bin/DocDB/private/ShowDocument?docid=650 Radiation dose papers]
+
# [[ Radiation dose papers]]
 
+
  
 
== Ongoing Work ==
 
== Ongoing Work ==

Revision as of 17:15, 6 November 2020

MOLLER Wiki
MOLLER page
DocDB
Project
Teleconferences
Bluejeans

Milestones

  1. hybrid/segmented downselect - November 15
  2. collimators (mid- December)
  3. Review irradiation papers by mid-December
  4. beam pipes and enclosures - Start mid-December
  5. Supports at low radius

Documentation

To be reviewed:

  1. Specifications
  2. Nomenclature
  3. Radiation dose papers

Ongoing Work

text
The MOLLER spectrometer in TOSCA
text
Layout of the hybrid torus conductor
  • Collimator 1+2 merge (Chandan)
  • Tolerances
    • Physics - Done
    • Interference with envelopes - Done
    • Doses on coils
    • Clean transport to dump
  • Optimizing upstream coil shielding (Naz)

Working Group Members

  • Internal Working Group
    • Ruben Fair (Project lead)
    • Juliette Mammei (collaboration lead)
  • External Working Group
  • Review Committee Members (as needed)




old wiki