All public logs
Combined display of all available logs of Moller Wiki. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).
- 14:32, 29 August 2024 Pking (Talk | contribs) moved page Analysis Mtg 240826 to Analysis Mtg 240829 (Change of meeting date)
- 14:49, 3 June 2024 Pking (Talk | contribs) moved page Analysis Mtg 240610 to Analysis Mtg 240610 -- Cancelled
- 14:56, 14 April 2023 Pking (Talk | contribs) moved page CountingDaq 230414 to CountingDaq 230428 (Meeting on April 14 was cancelled)
- 16:41, 24 February 2023 Pking (Talk | contribs) uploaded File:TInodeTest 20230224.pdf
- 13:55, 4 November 2022 Pking (Talk | contribs) uploaded File:TIlinkTest.pdf (Notes from W. Gu about testing of the TI bridge functionality)
- 01:34, 26 October 2022 Pking (Talk | contribs) moved page IntegrationDaq 221021 to IntegrationDaq 221104 (Meeting on 10/21 was cancelled and next meeting is 11/04)
- 18:50, 8 September 2022 Pking (Talk | contribs) uploaded File:IntegratingADC chassis 4.jpeg (Integrating ADC in the chassis, with upper cover installed, viewed from rear)
- 18:49, 8 September 2022 Pking (Talk | contribs) uploaded File:IntegratingADC chassis 3.jpeg (Integrating ADC in the chassis, with upper cover installed, viewed from front)
- 18:48, 8 September 2022 Pking (Talk | contribs) uploaded File:IntegratingADC chassis 2.jpeg (Integrating ADC in the chassis, with upper cover removed, viewed from rear)
- 18:47, 8 September 2022 Pking (Talk | contribs) uploaded File:IntegratingADC chassis 1.jpeg (Integrating ADC in the chassis, with upper cover removed, viewed from front)
- 14:30, 5 April 2022 Pking (Talk | contribs) moved page CountingDaq 220401 to CountingDaq 220415 (Meeting date was changed from 1 April to 15 April)
- 21:45, 28 July 2021 Pking (Talk | contribs) uploaded a new version of File:B0227 SEE S H module sch RevB p1.pdf (Rotated the file)
- 20:51, 28 July 2021 Pking (Talk | contribs) uploaded File:B0227 SEE S H module sch RevB p1.pdf (Schematic for one channel of a SEE sample and hold module.)
- 19:52, 12 February 2021 Pking (Talk | contribs) uploaded File:Stripline signal levels.pdf
- 17:13, 9 December 2020 Pking (Talk | contribs) uploaded File:Pking countingdaq 20201209.pdf (Brief summary of conceptual design of counting DAQ for 9 December 2020 meeting)
- 16:45, 14 December 2018 Pking (Talk | contribs) uploaded File:Pking daq 20181214.pdf (Notes on the gating and triggering of previous parity DAQ systems, to help understand how the streaming readout may be integrated.)