Thursday, March 26, 2020 2pm ET

From Moller Wiki
Revision as of 18:04, 26 March 2020 by Crowder (Talk | contribs)

Jump to: navigation, search

previous meeting << >> following meeting

 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560
 International toll number:         408-740-7256
 Bluejeans CODE:                    734 609 7559
 Bluejeans link: https://bluejeans.com/7346097559

Agenda

  • Slack signup
    • So far - Robin, Dave, Ruben, Probir, Sandesh, Kent, Sakib, myself, Rakitha
  • Notes from previous meetings
    1. February 27
      1. Design of Experiments - Determine minimum required set of DS torus coil sensitivity studies for Juliette - Probir - by 12th March
      2. Continue with assessment of forces and stresses for both DS coil options (include coil support structures and include additional potential electrical fault scenario identified by Ruben yesterday) - Sandesh - completion date TBD
      3. Confirm stability of power supplies at low operating currents - Ruben - completion date TBD
      4. Send scripts for magnetic field generation to Probir - Juliette
      5. Make new field maps with 5 magnets (vs 2) for both the Hybrid and Segmented - Probir - date TBD
      6. Select new US coil design and create new blocky model - Dave/Sandesh/Probir - completion date TBD
      7. Update Pugh matrix to include higher operating current and safer coil design criteria - Ruben - by 03.02.2020
      8. Send G10 coil support block locations to Juliette - Sandesh - by 03.02.2020
      9. Probir to arrange for telecon with Juliette to discuss how to distinguish between ee and ep envelopes in Probir's TOSCA model - Probir - date TBD
    2. March 12
      1. KK and JM confirmed that hybrid and segmented (both) are OK from the physics optics point of view. Need conformation in writing. (Action - KK/JM)
      2. Segmented version with improved sub-coil 4 to reduce voltage requirement (MPS) will be sent to JM to run a simulation. (JLab)
      3. Provide segmented coil (asymmetric model) to JM to run a simulation. (JLab)
      4. Provide hybrid coil configuration (asymmetric model) to JM to run a simulation. (JLab)
      5. Provide a timeline to get the required data sets (JLab blocky models) for Points 2, 3, and 4. (JLab - Probir)
      6. Provide segmented coil (asymmetric model) using KK/JM suggestion for the asymmetry. (JLab)
      7. For Points 3 and 4, JLab to provide the ideal symmetry coil sets as a reference for evaluation. (JLab)
      8. JLab shared the sensitivity asymmetric configuration for Point 3 as planned.
  • Status updates
  • Next meeting

Minutes

Attendance: Juliette, Sakib,

  • Slack signup
  • Go over minutes/lists from previous meetings
  • Status reports
    1. February 27
    2. March 12
  • Next meeting


Return to Spectrometer Meetings