Thursday, March 26, 2020 2pm ET
From Moller Wiki
previous meeting << >> following meeting
BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 International toll number: 408-740-7256 Bluejeans CODE: 734 609 7559 Bluejeans link: https://bluejeans.com/7346097559
Agenda
- Slack signup
- So far - Robin, Dave, Ruben, Probir, Sandesh, Kent, Sakib, myself, Rakitha
- Notes from previous meetings
- February 27
- Design of Experiments - Determine minimum required set of DS torus coil sensitivity studies for Juliette - Probir - by 12th March
- Continue with assessment of forces and stresses for both DS coil options (include coil support structures and include additional potential electrical fault scenario identified by Ruben yesterday) - Sandesh - completion date TBD
- Confirm stability of power supplies at low operating currents - Ruben - completion date TBD
- Send scripts for magnetic field generation to Probir - Juliette
- Make new field maps with 5 magnets (vs 2) for both the Hybrid and Segmented - Probir - date TBD
- Select new US coil design and create new blocky model - Dave/Sandesh/Probir - completion date TBD
- Update Pugh matrix to include higher operating current and safer coil design criteria - Ruben - by 03.02.2020
- Send G10 coil support block locations to Juliette - Sandesh - by 03.02.2020
- Probir to arrange for telecon with Juliette to discuss how to distinguish between ee and ep envelopes in Probir's TOSCA model - Probir - date TBD
- March 12
- KK and JM confirmed that hybrid and segmented (both) are OK from the physics optics point of view. Need conformation in writing. (Action - KK/JM)
- Segmented version with improved sub-coil 4 to reduce voltage requirement (MPS) will be sent to JM to run a simulation. (JLab)
- Provide segmented coil (asymmetric model) to JM to run a simulation. (JLab)
- Provide hybrid coil configuration (asymmetric model) to JM to run a simulation. (JLab)
- Provide a timeline to get the required data sets (JLab blocky models) for Points 2, 3, and 4. (JLab - Probir)
- Provide segmented coil (asymmetric model) using KK/JM suggestion for the asymmetry. (JLab)
- For Points 3 and 4, JLab to provide the ideal symmetry coil sets as a reference for evaluation. (JLab)
- JLab shared the sensitivity asymmetric configuration for Point 3 as planned.
- February 27
- Status updates
- Next meeting
Minutes
Attendance: Juliette, Sakib,
- Slack signup
- Go over minutes/lists from previous meetings
- Status reports
- February 27
- March 12
- February 27
- Next meeting
Return to Spectrometer Meetings