Spectrometer

From Moller Wiki
Revision as of 17:37, 2 November 2020 by Crowder (Talk | contribs)

Jump to: navigation, search
MOLLER Wiki
MOLLER page
DocDB
Project
Teleconferences
Bluejeans

Milestones

  1. hybrid/segmented downselect - November 15
  2. collimators (mid- December)
  3. Review irradiation papers by mid-December
  4. beam pipes and enclosures - Start mid-December
  5. Supports at low radius

Documentation

  1. Specifications
  2. Nomenclature


Ongoing Work

text
The MOLLER spectrometer in TOSCA
text
Layout of the hybrid torus conductor
  • Collimator 1+2 merge (Chandan)
  • Tolerances
    • Physics - Done
    • Interference with envelopes - Done
    • Doses on coils
    • Clean transport to dump
  • Optimizing upstream coil shielding (Naz)


Working Group Members

  • Internal Working Group
    • Ruben Fair (Project lead)
    • Juliette Mammei (collaboration lead)
  • External Working Group
  • Review Committee Members (as needed)




old wiki