Difference between revisions of "IntegrationDaq 220812"

From Moller Wiki
Jump to: navigation, search
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
 
Back to [[Main_Page|Main Page]] >>  [[DAQ Meetings|Data Acquisition Meetings]] >>  [[DAQ Meetings#Integrating mode DAQ meetings|Integrating mode DAQ meetings]]
 
Back to [[Main_Page|Main Page]] >>  [[DAQ Meetings|Data Acquisition Meetings]] >>  [[DAQ Meetings#Integrating mode DAQ meetings|Integrating mode DAQ meetings]]
  
[[IntegrationDaq_220812 | previous meeting]] <<  >> [[IntegrationDaq_220826 | following meeting]]
+
[[IntegrationDaq_220715 | previous meeting]] <<  >> [[IntegrationDaq_220826 | following meeting]]
  
 
== Meeting information ==
 
== Meeting information ==
Line 27: Line 27:
  
 
== Minutes ==
 
== Minutes ==
Recording at zoomgov:   
+
Recording at zoomgov:  [https://jlab-org.zoomgov.com/rec/share/BZd_c7g-RaprI2AltW0AGXB-sMgh02jPtweUcIc95jKbHaqgNl6QkmKaMhf2ICIP.v6eup_UDosvgrRSc?startTime=1660319661000]
  
Participants:
+
Participants: W. Gu, P. King, B. Moffit, R. Michaels, B. Blaikie, B. Shaw, J. Pan, C. Zorn, D. McNulty, M. Gericke
 +
 
 +
*  Activity updates
 +
**  Discussion of initial chassis design by Armen
 +
***  TRIUMF and Manitoba have not yet done design work on the chassis
 +
***  The airflow is side-to-side
 +
***  The chassis is 2U.  In my rackmount estimates, I'd assumed 1U plus 1U for airflow, so a 2U side-to-side chassis would be about the same rack footprint as I had estimated
 +
***  It uses the present size of the board, which is why it isn't just an off-the-shelf rackmount box.  Michael and Jie say that the board could be made slightly smaller without any layout changes (or with very minimal changes); but right now we don't think that is needed
 +
***  We can talk with Chris about the airflow.  We could also do a CFD to see what the cooling might be.  We can also just try the prototype and see how it performs
 +
***  Bryerton suggests putting some venting above the CPU fan, if that is the only fan in the box
 +
**  Bob expects to be able to bring the module to William within a week or so
 +
**  William has tested the TI-node in master mode on the independent development board
 +
***  The master mode is what Bryan would use to develop the CODA interface
 +
***  This is the same version of the TI-node as what Bryerton has already integrated into the FPGA
 +
**  Bryerton and Daryl need to have the TI slave connection demonstrated before we would produce more boards
 +
***  Bryan will send information to Bryerton about what registers to set to put the TI-node into slave mode and how to tell if the TI-node is connecting properly to the master
 +
**  Michael reports that the replacement amplifier chip delivery has been delayed until the end of October.  Daryl will modify two more of the prototype boards; one  will go to Mainz and one will go to Dustin.
 +
**  Michael also reports that the 40 Enclustra FPGA modules we'd need for all the modules have now been shipped.
 +
*  Bob, Michael, and Paul need to get together to finalize what firmware modes we're requesting from Bryerton
 +
*  We plan to keep these meetings at noon eastern on alternating Fridays.  The next meeting will be 26 August.

Latest revision as of 14:32, 26 August 2022

Back to Main Page >> Data Acquisition Meetings >> Integrating mode DAQ meetings

previous meeting << >> following meeting

Meeting information

 Meeting time:  12:00pm Eastern
 
 Zoom connection information
 Join ZoomGov Meeting
 https://jlab-org.zoomgov.com/j/1603800887?pwd=aXVmSnN6aWZWN3RBdXB4RUhGckZJdz09
 
 Meeting ID: 160 380 0887
 Passcode: 903612
 US Tool free phone: (833) 568 8864
 Find your local number: https://jlab-org.zoomgov.com/u/ab8341cjcG

Agenda

  • Activity updates
    • Possible chassis design by Armen (JLab)
  • General discussion

Open Issues to be followed up later

  1. Discussions with M. Pitt & J. Musson to understand the beam monitor signals we'll be getting
  2. Draft timing diagram: DocDB 790
  3. Michael, Bob, Brynne, and Paul should put together a list of the integrator running modes we would like to have available

Minutes

Recording at zoomgov: [1]

Participants: W. Gu, P. King, B. Moffit, R. Michaels, B. Blaikie, B. Shaw, J. Pan, C. Zorn, D. McNulty, M. Gericke

  • Activity updates
    • Discussion of initial chassis design by Armen
      • TRIUMF and Manitoba have not yet done design work on the chassis
      • The airflow is side-to-side
      • The chassis is 2U. In my rackmount estimates, I'd assumed 1U plus 1U for airflow, so a 2U side-to-side chassis would be about the same rack footprint as I had estimated
      • It uses the present size of the board, which is why it isn't just an off-the-shelf rackmount box. Michael and Jie say that the board could be made slightly smaller without any layout changes (or with very minimal changes); but right now we don't think that is needed
      • We can talk with Chris about the airflow. We could also do a CFD to see what the cooling might be. We can also just try the prototype and see how it performs
      • Bryerton suggests putting some venting above the CPU fan, if that is the only fan in the box
    • Bob expects to be able to bring the module to William within a week or so
    • William has tested the TI-node in master mode on the independent development board
      • The master mode is what Bryan would use to develop the CODA interface
      • This is the same version of the TI-node as what Bryerton has already integrated into the FPGA
    • Bryerton and Daryl need to have the TI slave connection demonstrated before we would produce more boards
      • Bryan will send information to Bryerton about what registers to set to put the TI-node into slave mode and how to tell if the TI-node is connecting properly to the master
    • Michael reports that the replacement amplifier chip delivery has been delayed until the end of October. Daryl will modify two more of the prototype boards; one will go to Mainz and one will go to Dustin.
    • Michael also reports that the 40 Enclustra FPGA modules we'd need for all the modules have now been shipped.
  • Bob, Michael, and Paul need to get together to finalize what firmware modes we're requesting from Bryerton
  • We plan to keep these meetings at noon eastern on alternating Fridays. The next meeting will be 26 August.