IntegrationDaq 220812
From Moller Wiki
Back to Main Page >> Data Acquisition Meetings >> Integrating mode DAQ meetings
previous meeting << >> following meeting
Meeting information
Meeting time: 12:00pm Eastern Zoom connection information Join ZoomGov Meeting https://jlab-org.zoomgov.com/j/1603800887?pwd=aXVmSnN6aWZWN3RBdXB4RUhGckZJdz09 Meeting ID: 160 380 0887 Passcode: 903612 US Tool free phone: (833) 568 8864 Find your local number: https://jlab-org.zoomgov.com/u/ab8341cjcG
Agenda
- Activity updates
- Possible chassis design by Armen (JLab)
- General discussion
Open Issues to be followed up later
- Discussions with M. Pitt & J. Musson to understand the beam monitor signals we'll be getting
- Draft timing diagram: DocDB 790
- Michael, Bob, Brynne, and Paul should put together a list of the integrator running modes we would like to have available
Minutes
Recording at zoomgov: [1]
Participants: W. Gu, P. King, B. Moffit, R. Michaels, B. Blaikie, B. Shaw, J. Pan, C. Zorn, D. McNulty, M. Gericke
- Activity updates
- Discussion of initial chassis design by Armen
- TRIUMF and Manitoba have not yet done design work on the chassis
- The airflow is side-to-side
- The chassis is 2U. In my rackmount estimates, I'd assumed 1U plus 1U for airflow, so a 2U side-to-side chassis would be about the same rack footprint as I had estimated
- It uses the present size of the board, which is why it isn't just an off-the-shelf rackmount box. Michael and Jie say that the board could be made slightly smaller without any layout changes (or with very minimal changes); but right now we don't think that is needed
- We can talk with Chris about the airflow. We could also do a CFD to see what the cooling might be. We can also just try the prototype and see how it performs
- Bryerton suggests putting some venting above the CPU fan, if that is the only fan in the box
- Bob expects to be able to bring the module to William within a week or so
- William has tested the TI-node in master mode on the independent development board
- The master mode is what Bryan would use to develop the CODA interface
- This is the same version of the TI-node as what Bryerton has already integrated into the FPGA
- Bryerton and Daryl need to have the TI slave connection demonstrated before we would produce more boards
- Bryan will send information to Bryerton about what registers to set to put the TI-node into slave mode and how to tell if the TI-node is connecting properly to the master
- Michael reports that the replacement amplifier chip delivery has been delayed until the end of October. Daryl will modify two more of the prototype boards; one will go to Mainz and one will go to Dustin.
- Michael also reports that the 40 Enclustra FPGA modules we'd need for all the modules have now been shipped.
- Discussion of initial chassis design by Armen
- Bob, Michael, and Paul need to get together to finalize what firmware modes we're requesting from Bryerton
- We plan to keep these meetings at noon eastern on alternating Fridays. The next meeting will be 26 August.