Difference between revisions of "IntegrationDaq 210908"

From Moller Wiki
Jump to: navigation, search
(Minutes)
Line 2: Line 2:
 
Back to [[Main_Page|Main Page]] >>  [[DAQ Meetings|Data Acquisition Meetings]] >>  [[DAQ Meetings#Integrating mode DAQ meetings|Integrating mode DAQ meetings]]
 
Back to [[Main_Page|Main Page]] >>  [[DAQ Meetings|Data Acquisition Meetings]] >>  [[DAQ Meetings#Integrating mode DAQ meetings|Integrating mode DAQ meetings]]
  
[[IntegrationDaq_210813 | previous meeting]] <<  >> [[IntegrationDaq_210908 | following meeting]]
+
[[IntegrationDaq_210813 | previous meeting]] <<  >> [[IntegrationDaq_210922 | following meeting]]
  
 
== Meeting information ==
 
== Meeting information ==

Revision as of 18:43, 8 September 2021

Back to Main Page >> Data Acquisition Meetings >> Integrating mode DAQ meetings

previous meeting << >> following meeting

Meeting information

 Meeting time:  3:00pm Eastern
 
 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560 
 Other BlueJeans access phone numbers are listed at https://www.bluejeans.com/premium-numbers
 
 Bluejeans CODE:                    385 600 867
 Bluejeans link: https://bluejeans.com/385600867

Agenda

  • Activity updates
    • Bob has sent drafts of requirements document and ICD to Paul; plan to circulate these early next week
    • Draft timing diagram: DocDB 790
  • General discussion


Open Issues to be followed up later

  1. Need two things by end of August (no hard deadline). Some of this is just cut/paste from existing docs.
    1. Design requirements document -- examples and template : http://userweb.jlab.org/~rom/mollerdaq/design
    2. ICD -- interface control document(s). -- apparently Robin Wines made a template and it's on sharepoint. It seems we need several of these (infrastructure to DAQ; detectors to DAQ, etc).
  2. Discussions with M. Pitt & J. Musson to understand the beam monitor signals we'll be getting
  3. Create a timing diagram showing the integration gates in the injector and hall, helicity transitions, etc.

Minutes

Recording on Bluejeans.com:

Absent: M. Gericke, C. Cuevas, B. Shaw, D. Bishop

Participants: