Difference between revisions of "Spectrometer"

From Moller Wiki
Jump to: navigation, search
Line 29: Line 29:
 
== Ongoing Work ==
 
== Ongoing Work ==
  
 
{| cellpadding=5 style="margin:7px 30px 0 30px; <!--
 
  --> float:right; border:1px solid #AA6633"
 
|- bgcolor="#fbfeff"
 
| [[File:Both toroids.PNG|thumb|upright=1.5|alt=text|The MOLLER spectrometer in TOSCA]]
 
|-
 
|[[File:Layout.png|thumb|upright=1.5|alt=text|Layout of the hybrid torus conductor]]
 
|}
 
  
 
{| cellpadding=5 style="margin:7px 30px 0 30px; <!--
 
{| cellpadding=5 style="margin:7px 30px 0 30px; <!--
Line 59: Line 51:
  
 
* Internal Working Group
 
* Internal Working Group
* External Working Group
+
** Ruben Fair (Project lead)
* Review Committee Members
+
** Juliette Mammei (collaboration lead)
 +
* External Working Group  
 +
* Review Committee Members (as needed)
  
  

Revision as of 17:37, 2 November 2020

MOLLER Wiki
MOLLER page
DocDB
Project
Teleconferences
Bluejeans

Milestones

  1. hybrid/segmented downselect - November 15
  2. collimators (mid- December)
  3. Review irradiation papers by mid-December
  4. beam pipes and enclosures - Start mid-December
  5. Supports at low radius

Documentation

  1. Specifications
  2. Nomenclature


Ongoing Work

text
The MOLLER spectrometer in TOSCA
text
Layout of the hybrid torus conductor
  • Collimator 1+2 merge (Chandan)
  • Tolerances
    • Physics - Done
    • Interference with envelopes - Done
    • Doses on coils
    • Clean transport to dump
  • Optimizing upstream coil shielding (Naz)


Working Group Members

  • Internal Working Group
    • Ruben Fair (Project lead)
    • Juliette Mammei (collaboration lead)
  • External Working Group
  • Review Committee Members (as needed)




old wiki