Difference between revisions of "Spectrometer"

From Moller Wiki
Jump to: navigation, search
Line 18: Line 18:
 
# [[hybrid/segmented downselect]] - November 15
 
# [[hybrid/segmented downselect]] - November 15
 
# [[collimators]]  (mid- December)
 
# [[collimators]]  (mid- December)
 
 
 
# [[Review irradiation papers]] by mid-December
 
# [[Review irradiation papers]] by mid-December
 
 
 
# [[beam pipes and enclosures]] - are major changes required? - Start mid-December
 
# [[beam pipes and enclosures]] - are major changes required? - Start mid-December
 
# [[Supports at low radius]]
 
# [[Supports at low radius]]

Revision as of 17:28, 2 November 2020

MOLLER Wiki
MOLLER page
DocDB
Project
Teleconferences
Bluejeans

Milestones

  1. hybrid/segmented downselect - November 15
  2. collimators (mid- December)
  3. Review irradiation papers by mid-December
  4. beam pipes and enclosures - are major changes required? - Start mid-December
  5. Supports at low radius
  6. Specifications document
  7. Nomenclature document (and used consistently)

Working Group Members

  • Internal Working Group
  • External Working Group
  • Review Committee Members
text
The MOLLER spectrometer in TOSCA
text
Layout of the hybrid torus conductor





old wiki