Line 18: Line 18:
 
# [[hybrid/segmented downselect]] - November 15
 
# [[hybrid/segmented downselect]] - November 15
 
# [[collimators]]  (mid- December)
 
# [[collimators]]  (mid- December)
## collimator 1, 2 merge
+
 
## hot spots on upstream
+
### W plate
+
### optimize the 2-bounce shield (Chandan, Naz)
+
## collimator 4 (resculpting)
+
## collimator 5 (including "septapus" for shielding)
+
  
 
# [[Review irradiation papers]] by mid-December
 
# [[Review irradiation papers]] by mid-December
## Cip, KK, Kent, Juliette
 
## Can we live with higher doses on the epoxy than we have been assuming?
 
## Do we trust the results?
 
## Are the energies/species close enough?
 
  
# beam pipes and enclosures - are major changes required? - Start mid-December
 
## upstream enclosure and pipes (mid-December)
 
## clean beam transport due to the SAMs intrusions into the pipe
 
### Cip has a student designing the SAM intrusions
 
## aperture in the dump tunnel
 
  
# Supports at low radius
+
# [[beam pipes and enclosures]] - are major changes required? - Start mid-December
 +
 
 +
 
 +
# [[Supports at low radius]]
 
## inter-coil supports "under" the envelopes
 
## inter-coil supports "under" the envelopes
 
## now 2-bounce shield is load bearing?
 
## now 2-bounce shield is load bearing?
 
## DS torus "2-bounce" not needed, but septapus for shielding
 
## DS torus "2-bounce" not needed, but septapus for shielding
  
# Specifications document
+
# [[Specifications document]]
 
## KK and Juliette will look at red text  
 
## KK and Juliette will look at red text  
 
## We should meet to discuss these
 
## We should meet to discuss these
  
# Nomenclature documented (and used consistently)
+
# [[Nomenclature document]] (and used consistently)
  
 
== Working Group Members ==
 
== Working Group Members ==

Revision as of 17:24, 2 November 2020

MOLLER Wiki
MOLLER page
DocDB
Project
Teleconferences
Bluejeans

Milestones

  1. hybrid/segmented downselect - November 15
  2. collimators (mid- December)


  1. Review irradiation papers by mid-December


  1. beam pipes and enclosures - are major changes required? - Start mid-December


  1. Supports at low radius
    1. inter-coil supports "under" the envelopes
    2. now 2-bounce shield is load bearing?
    3. DS torus "2-bounce" not needed, but septapus for shielding
  1. Specifications document
    1. KK and Juliette will look at red text
    2. We should meet to discuss these
  1. Nomenclature document (and used consistently)

Working Group Members

  • Internal Working Group
  • External Working Group
  • Review Committee Members
text
The MOLLER spectrometer in TOSCA
text
Layout of the hybrid torus conductor





old wiki