IntegrationDaq 240112

From Moller Wiki
Jump to: navigation, search

Back to Main Page >> Data Acquisition Meetings >> Integrating mode DAQ meetings

previous meeting << >> following meeting

Meeting information

 Meeting time:  1:00pm Eastern
 
 Zoom connection information is sent out by email; please reach out to Paul if you don't have the current link.

Agenda

Open Issues to be followed up later

  1. Discussions with M. Pitt & J. Musson to understand the beam monitor signals we'll be getting
  2. Draft timing diagram: DocDB 790
  3. Michael, Bob, Brynne, and Paul should put together a list of the integrator running modes we would like to have available

Minutes

Recording at zoomgov:

Participants: R. Michaels, P. King, W. Gu, R. Conaway, B. Blaikie, D. Bishop, C. Cuevas, S. Chatterjee, A. Sen, J. Pan, M. Gericke, H. Liu, D. McNulty, W. Li, K. Dehmelt

  • Activity updates
    • Daryl has no new report. Bryerton is on vacation this week.
    • Michael has not yet started testing the 2nd prototypes yet, but plans to do that in the next week. Part of the delay has been getting a new PoE switch
      • We discuss what switch we might want for use in the hall; Daryl and Paul will send Michael some suggestions for discussion
    • Digital beam monitor project
      • Bob has been able to read the digital stream from the receiver when he injects various RF powers into it. He is seeing a lot of noise at the higher
    • Dustin reiterates what he had reported at the end of the year: the 5.6V DC-DC converters seem to be more radiation resistant. He's happy to do more testing if needed.
      • KK would like to have a meeting with Michael and Dustin about the DC-DC converter radiation studies and what to do for the experiment
    • Bill Li mentions that they are working on setting up the GEM test stand at Stony Brook
  • General discussion
    • Space needs for test stands at JLab
      • Planning for two new test stands, one for polarimetery and one for the integrating DAQ tests.
      • Bob says we just need to come up with a plan for how much space we need, and that Walt Akers was pretty optimisitic about finding space for us.
    • Hanjie mentions that she will be helping Sayak to set up the UMass test stand to do the detector segment testing.