IntegrationDaq 230908
From Moller Wiki
Back to Main Page >> Data Acquisition Meetings >> Integrating mode DAQ meetings
previous meeting << >> following meeting
Meeting information
Meeting time: 1:00pm Eastern Zoom connection information is sent out by email; please reach out to Paul if you don't have the current link.
Agenda
- Activity updates
- General discussion
Open Issues to be followed up later
- Discussions with M. Pitt & J. Musson to understand the beam monitor signals we'll be getting
- Draft timing diagram: DocDB 790
- Michael, Bob, Brynne, and Paul should put together a list of the integrator running modes we would like to have available
Minutes
Recording at zoomgov: [1]
Participants: R. Conaway, B. Moffit, W. Gu, P. King, S. Chatterjee, B. Shaw, D. Bishop, J. Pan, B. Blaikie, D. McNulty, M. Gericke, R. Michaels
- Michael says that they are ordering the components for the prototype boards before sending the board out for fabrication
- Daryl comments that the design is complete and the final design is available if anyone wants to take a last look at the design before it goes out for fabrication
- Bryan does not have an update
- Paul and Bob will follow up with him about the next steps
- Jie and Michael have ordered five of the new base+amplifier assemblies. The new bases have an attenuator built in for the counting mode chain so we don't have to use the full 10x amplification; that can be changed with a resistor change.
- William says that we don't have the timing shift implemented in the TI node on the ADC. The longer offset time to account for the hall and injector time difference would be handled by the TI bridge
- Paul will send an email to William with more discussion of possible delays between
- Bryerton reports that he's updated an issue with the ADC alignment, and that also fixed an issue where some channels wouldn't respond
- Bryerton asks if we have the "list of the integrator running modes" ready yet.
- Paul and Michael and Bob will look back at what we had discussed previously, update it, and then discuss it with Bryerton to see what parts are easy or difficult to implement