Agenda
- Paul King - DAQ system change: Running the trigger interface interconnect fiber from the ISB to the Hall. DocDB 1041
- Discussion of future agenda topics
Deferred:
- Ciprian Gal - Beamline Change: Adding Harp to Compton Beamline. DocDB 1042
- Ciprian Gal - Stripline vs 20cm BPMs in Hall A line DocDB 1043
Minutes
Proposal: run a TI fiber interconnection between Injector Service Building & CHA/Hall A (Paul King)
- required by newer versions of CODA software and hardware
- This is essential, and it was an oversight to not include this in original budget
- About $15k fiber+installation ISB->CH (on NSF), about $10k CH->Hall A (on DOE project)
- TB agrees this is required.
Update on Counting Mode hardware: removal of discriminators and VETROC in scintillator readout
- This change was already presented (briefly) in the Dec '21 collaboration meeting and the April 7, '22 Detector meeting
- The FADC readout, with 4ns time bins, will provide suitable time resolution for coincidence triggers of scintillators.
- The 4ns time resolution will be improved by edge finding on the risetime of a signal. The time resolution for tracking is well beyond what is needed for the 25ns APV GEM readout time binning
- The FADC clocks will be synched.
- There were no objections to this change.
- Several side issues were raised:
- It was noted that while the primary trigger required a front and back scintillator, alternative triggers such as those required for hunting backgrounds would also be possible. This includes an open pulsar trigger.
- The long cable (about 200ft) from the scintillator amplifier to the FADC should be fully qualified, testing the readout with cosmics
- some further discussion of cabling issues let to a suggestion of a separate meeting to discuss those in detail
Attendance
- Kent Paschke, Chair (MOLLER Scientific Coordinator)
- Krishna Kumar (MOLLER Spokesperson)
- Mark Pitt (Deputy Spokesperson, MOLLER-NSF Project Coordinator)
- Jim Fast (DOE Project Manager)
- Michael Gericke (MOLLER-CFI Project Coordinator)
- Paul A Souder (Elected Executive Board Member)
- David Armstrong (Elected Executive Board Member)
- Robin Wines (Project Engineer)
- Mike Dion (L2 CAM: Spectrometer)
- Ciprian Gal (L2 CAM: Infrastructure)
- Robert Michaels (L2 CAM: DAQ)
- Vladimir Berdnikov (L2 CAM: Installation)
- Caryn Palatchi (Working Group Convener: Polarized Beam)
- Dustin McNulty (Working Group Convener: Integrating Detectors)
- Paul King (Working Group Convener: DAQ)
- Nilanga Liyanage (Working Group Convener: Tracking Detectors)
- Jim Napolitano (Working Group Convener: Polarimetry)
- Rakitha Beminiwattha (Working Group Convener: Simulations)
Absent:
- Jessie Butler (Deputy DOE Project Manager)
- Juliette Mammei (Executive Board International Representative)
- Mark Jones (Hall A Leader)
- Dave Meekins (L2 CAM: Target)
- Carl Zorn (L2 CAM: Detectors)
- Silviu Covrig (Working Group Convener: Target)
- Yury Kolomensky (Working Group Convener: Physics Extraction)