Simulation Meeting October spooky 31 2019 1030AM ET

From Moller Wiki
Revision as of 14:18, 31 October 2019 by Rakithab (Talk | contribs)

Jump to: navigation, search

Back to Main Page >> Simulation Meetings

previous meeting << >> following meeting



Simulation Task List Updated 2019

Agenda

  • Detector background Update by Sakib
  • Get new people up to speed and Progress

Potential Tasks for Detector Area Simulation

  1. look closely at the residual source of photons from the upstream collimator regions to see if they can be further reduced
  2. replace the outer kryptonite shield with the properly tuned lintels and 3 downstream collars
  3. review the current status of the beam dump background and its impact on the detector plane region
  4. construct the geometry of the detector PMT shielding, combine with backgrounds coming from the light guide and quartz tiles, and evaluate the final background levels at the main detector PMTs

Attendance

Attendance:

Minutes



Return to Simulation Meetings
Return to Main Page