CountingDaq 240426

From Moller Wiki
Revision as of 17:09, 3 May 2024 by Sayak (Talk | contribs) (Agenda)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Back to Main Page >> Data Acquisition Meetings >> Counting mode DAQ meetings

previous meeting << >> following meeting

Meeting information

 Meeting time:  1:00pm Eastern
   
  Zoom connection information is sent out by email; please reach out to Paul if you don't have the current link.

Agenda

Minutes

Recording on Zoom:

Participants: S. Malace, P. King, B. Moffit, R. Conaway, K. Dehmelt, S. Chatterjee, R. Fair, A. Sen, C. Ghosh, H. Liu, D. McNulty, W. Li

  • FADC purchase order is on the way out of Ohio
  • Simona has the bitstream file back from Ben, they have tested the VTP, and found a small mistake in the firmware which Ben is in the process of resolving.
    • She expects to have that back from him today, and would be able to test it by Monday
    • Next would be the pion detector prototype stand work.
    • She expects to have data using a coincidence trigger in the VTP by Tuesday
  • Sayak presents a summary of the cosmic setup at UMass
    • Using two scintillators at the top and bottom right now, in two configurations to
    • Proposed setup for W&M: four scintillators (2 at top and 2 at the bottom) per segment.
    • I would propose that we plan to use a VTP trigger to form the four sets of coincidences.
    • They have the FADC back from JLab, and are getting the DAQ set up to use it
  • Simona asks about the using the MOLLER log book (at https://logbooks.jlab.org/book/moller). That is supposed to be for the experiment, and "molpol" is for the polarimeters
  • Hanjie reports that the test stand at JLab is waiting on the data disk purchase for the server
  • Paul expects to make more progress on the VXS crate shipment
  • No update from SBU this week
  • Chandan is talking with Ben to get a VTP set up in the GEM test stand
  • Dustin reports that he will be getting a few of the new bases from Michael, and will be radiating the counting mode amplifier on May 9. This is the last radiation test for the bases.