Monday, February 13, 2023 9am ET
From Moller Wiki
previous meeting << >> following meeting
Zoom calling instructions: Zoom link: https://jlab-org.zoomgov.com/j/1610336969?pwd=T0hOMzRUbUVvMGlFTEZkMXBxYlZIZz09
Contents
[hide]Standing Agenda
Urgent Items (Please inform Juliette or Mike about items to be added here)
- Blocky locations for DS conductors has been provided to use in Tosca
- Not expected to having any significant impact (3 mm adjustment) but model should reflect current design specs
- Finalized design for sieve, blocker, and collimator 1 &2 (and 2 bounce) needs to be finalized
- JM is working e+ energy deposition in W and Pb for side plate dose investigation
- KP is performing sims of lintel locations (Prakash - postdoc)
- MIT finalizing design drawings
- MD working 3A items (schedule, procurements, etc.), cooling water activation
Status Reports not covered by urgent items
- JLAB
- MIT
- UVa
- Manitoba
Business arising from Status Reports
- required - lollipop for shielding the target
- HW for calculations
Return to Spectrometer Meetings
Return to MOLLER Wiki Main Page
Minutes
Attendance: