Monday, February 13, 2023 9am ET
From Moller Wiki
previous meeting << >> following meeting
Zoom calling instructions: Zoom link: https://jlab-org.zoomgov.com/j/1610336969?pwd=T0hOMzRUbUVvMGlFTEZkMXBxYlZIZz09
Standing Agenda
- Urgent Items
- Blocky locations for DS conductors has been provided to use in Tosca
- Not expected to having any significant impact (3 mm adjustment) but model should reflect current design specs
- Finalized design for sieve, blocker, and collimator 1 &2 (and 2 bounce) needs to be finalized
- JM is working e+ energy deposition in W and Pb for side plate dose investigation
- KP is performing sims of lintel locations
- MIT finalizing design drawings
- MD working 3A items (schedule, procurements, etc.), cooling water activation
- Blocky locations for DS conductors has been provided to use in Tosca
- Status Reports not covered by urgent items
- JLAB
- MIT
- Manitoba
- Business arising from Status Reports
Return to Spectrometer Meetings
Return to MOLLER Wiki Main Page
Minutes
Attendance: