Thursday, June 4, 2020 2pm ET

From Moller Wiki
Revision as of 17:50, 4 June 2020 by Crowder (Talk | contribs)

Jump to: navigation, search

previous meeting << >> following meeting

 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560
 International toll number:         408-740-7256
 Bluejeans CODE:                    734 609 7559
 Bluejeans link: https://bluejeans.com/7346097559

Agenda

  • Coil down-select (est. Aug. 28, 2020)
    • Physics summary document
      • all simulations completed
    • Pugh matrix for eng. factors, cost and schedule
    • Change control board
      • review Ruben's recommendation
      • make a decision
  • Design and alignment tolerances
    • worst-case scenarios are tolerable
    • independent of the coil type (seg. vs. hyb.)
    • Recommendation should be closed - the method is developed
    • single coil offset studies still planned
  • Overall tolerance document (in progress)
    • some sims needed to clarify items in document
    • will present at a later meeting
  • Doses on coils/epoxy/braces
    • preliminary study done a couple years ago
    • repeated with updated exp. geometry
      • still rough (but conservative) on order of 100 MGy
  • Stray field study related recommendations
    • Develop a magnetic measurement plan
    • Evaluate need for full field map
    • Tolerances for alignment should include clean transport of beam
  • Magnet maximum current specification
    • Design vs. operational limit
    • design current is 20% above operating current for 11 GeV beam at nominal temperature
    • matters for specification of KPP (key performance parameters)
  • Other business
  • Next meeting



Thanks,

Minutes

Attendance:




Return to Spectrometer Meetings