Thursday, June 18, 2020 2pm ET
From Moller Wiki
previous meeting << >> following meeting
BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 International toll number: 408-740-7256 Bluejeans CODE: 734 609 7559 Bluejeans link: https://bluejeans.com/7346097559
Agenda
- Initial Magnet Current scan results [1] (Garrett)
- Brief update on coil doses pdf (Juliette)
- Status of coil stresses pdf (Ruben)
- Status of upstream coil modifications (Ruben)
Minutes
Attendance: Juliette, Roger, David Flay, Jim Fast, Dave K., Garrett, Jay, KK, Naz, Probir, Qilull, Randy, Robin, Ruben, Sakib, Sandesh, Steve Wood
- Magnet scan
- Probably don't need to go above 10%
- can lower beam energy instead of raising the magnet current
- 3 days to do the setup of 10% lower
- go all the way to 4 pass 8.8 GeV
- take on the worst case
- look at r, dr/dz
- look at other tiles
- Dose update
- Estimate from this from SiO2 to cyanide esther or carbon (carbon fiber)
- Coil stresses and Upstream coil modifications
- working on estimated stresses on various supports
- slimming the upstream coil; add a 5th turn so NI is the same
- subcoil 4 power also
- Next meeting
- July 2nd