Difference between revisions of "Simulation Meeting January 30 2020 10AM ET"

From Moller Wiki
Jump to: navigation, search
(Minutes)
Line 19: Line 19:
 
=Minutes=
 
=Minutes=
 
* Sakib:
 
* Sakib:
 +
Sakib's plots [https://myumanitoba-my.sharepoint.com/:p:/g/personal/rahmans_myumanitoba_ca/EYq4okrdDf5BnAAmLypiIlQBai3Fpyh3oVSOufPenoQCkA?e=hIUugX]
 +
Cip's plots [https://drive.google.com/file/d/1U0NtyeozrbYOrUTBYB1s7c74Si33YNUi/view]
 
** Comparison of Hybrid vs new segmented using identical shielding design  
 
** Comparison of Hybrid vs new segmented using identical shielding design  
 
** See radial plots to compare two field maps  
 
** See radial plots to compare two field maps  

Revision as of 16:36, 30 January 2020

Back to Main Page >> Simulation Meetings

previous meeting << >> following meeting



Simulation Task List Updated 2019


Agenda

  • Immediate simulation tasks to complete - Ciprian, Sakib, Chandan

Attendance

Attendance: Dimitrii, Rakitha, Sakib, Micheal, Cameron

Minutes

  • Sakib:

Sakib's plots [1] Cip's plots [2]

    • Comparison of Hybrid vs new segmented using identical shielding design
    • See radial plots to compare two field maps
    • These plots will be used to provide feedback to JLab engineers to tune the new segmented field map. This will go in iterations until we get a satisfying outcome.
    • We will continue to do background simulation with current segmented field map. Depends on progress made by JLab engineers we may redo background analysis with an updated segmented field map.
  • Sakib and Wouter trying to fix a geometry implementation bug related to showermax detectors.
  • Cameron Also discussed about main detector geometry issue see : https://github.com/JeffersonLab/remoll-detector-generator/issues/3





Return to Simulation Meetings
Return to Main Page