Difference between revisions of "CountingDaq 210203"
From Moller Wiki
(→Agenda) |
|||
Line 24: | Line 24: | ||
** What else do we need to define? | ** What else do we need to define? | ||
* General discussion | * General discussion | ||
+ | |||
+ | |||
+ | == Minutes == | ||
+ | Participants: B. Moffit, R. Michaels, H. Liu, C. Ghosh, P. King | ||
+ | |||
+ | My original online notes were lost due to a window crash. Below are transcribed notes from a paper to-do list I was keeping in parallel. | ||
+ | |||
+ | * What we need to do before the preliminary design review? | ||
+ | ** Cabling and crate layouts | ||
+ | *** This should include block diagrams for the entire DAQ system | ||
+ | ** What else do we need to define? | ||
+ | *** We should make a list of all the modules and equipment we need to buy and what we are expecting to borrow from SBS or wherever | ||
+ | *** How will we switch between integrating and counting modes (other than the PMTs); will we need to switch anything by hand | ||
+ | *** What are the requirements and the interfaces to other subsystems | ||
+ | *** Grounding and shielding: need to discuss and coordinate with Michael. Star or mesh grounding layout? Michael has proposed a star layout | ||
+ | *** What are our requirements for deadtime, trigger rate, etc |
Latest revision as of 22:19, 10 February 2021
Back to Main Page >> Data Acquisition Meetings >> Counting mode DAQ meetings
previous meeting << >> following meeting
Meeting information
Meeting time: 2:00pm Eastern BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 Other BlueJeans access phone numbers are listed at https://www.bluejeans.com/premium-numbers Bluejeans CODE: 411 309 650 Bluejeans link: https://bluejeans.com/411309650
Agenda
- Follow-up from last meeting
- Update on GEM occupancy -Chandan docDB688
- What we need to do before the preliminary design review?
- Cabling and crate layouts
- FPGA trigger concepts
- Event data structure
- Data and event rate estimation
- What else do we need to define?
- General discussion
Minutes
Participants: B. Moffit, R. Michaels, H. Liu, C. Ghosh, P. King
My original online notes were lost due to a window crash. Below are transcribed notes from a paper to-do list I was keeping in parallel.
- What we need to do before the preliminary design review?
- Cabling and crate layouts
- This should include block diagrams for the entire DAQ system
- What else do we need to define?
- We should make a list of all the modules and equipment we need to buy and what we are expecting to borrow from SBS or wherever
- How will we switch between integrating and counting modes (other than the PMTs); will we need to switch anything by hand
- What are the requirements and the interfaces to other subsystems
- Grounding and shielding: need to discuss and coordinate with Michael. Star or mesh grounding layout? Michael has proposed a star layout
- What are our requirements for deadtime, trigger rate, etc
- Cabling and crate layouts