CountingDaq 210203

From Moller Wiki
Jump to: navigation, search

Back to Main Page >> Data Acquisition Meetings >> Counting mode DAQ meetings

previous meeting << >> following meeting

Meeting information

 Meeting time:  2:00pm Eastern
   
 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560
 Other BlueJeans access phone numbers are listed at https://www.bluejeans.com/premium-numbers
 
 Bluejeans CODE:                    411 309 650 
 Bluejeans link: https://bluejeans.com/411309650

Agenda

  • Follow-up from last meeting
    • Update on GEM occupancy -Chandan docDB688
  • What we need to do before the preliminary design review?
    • Cabling and crate layouts
    • FPGA trigger concepts
    • Event data structure
    • Data and event rate estimation
    • What else do we need to define?
  • General discussion


Minutes

Participants: B. Moffit, R. Michaels, H. Liu, C. Ghosh, P. King

My original online notes were lost due to a window crash. Below are transcribed notes from a paper to-do list I was keeping in parallel.

  • What we need to do before the preliminary design review?
    • Cabling and crate layouts
      • This should include block diagrams for the entire DAQ system
    • What else do we need to define?
      • We should make a list of all the modules and equipment we need to buy and what we are expecting to borrow from SBS or wherever
      • How will we switch between integrating and counting modes (other than the PMTs); will we need to switch anything by hand
      • What are the requirements and the interfaces to other subsystems
      • Grounding and shielding: need to discuss and coordinate with Michael. Star or mesh grounding layout? Michael has proposed a star layout
      • What are our requirements for deadtime, trigger rate, etc