Difference between revisions of "IntegrationDaq 210226"

From Moller Wiki
Jump to: navigation, search
(Agenda)
(Minutes)
 
Line 21: Line 21:
  
 
== Minutes ==
 
== Minutes ==
Participants:
+
Participants: B. Moffit, B. Blaikie, D. Bishop, J. Pan, M. Gericke, R. Michaels, W. Gu, P. King
 +
 
 +
*  Discussion of the DAQ/trigger 60% design review
 +
**  Plan to have an update on the ADC design, integration mode requirements, and an overview talk.  Michael, Bob, and Paul will have a follow up discussion to set the agenda
 +
**  Michael proposes two aspects to the review:  is the technical equipment sufficient to meet the requirements; and are the interfaces well defined.
 +
*  Grounding discussion
 +
**  Likely the ADC ground shield will be in common on each module
 +
**  We look at Michael's signal/grounding diagram.  In order to avoid ground-loops we should break the ground connection either just before the ADC input or just after the preamp
 +
**  Discussion seems to converge on the idea that the ground of the ground of the preamp should be connected back to the PMT/HV ground, and the output ground from the preamp would *not* be connected to the twin-ax cable ground shield.  The twin-ax ground shield would be connected to the integrator ground.

Latest revision as of 22:23, 12 March 2021

Back to Main Page >> Data Acquisition Meetings >> Integrating mode DAQ meetings

previous meeting << >> following meeting

Meeting information

 Meeting time:  3:30pm Eastern
 
 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560
 Other BlueJeans access phone numbers are listed at https://www.bluejeans.com/premium-numbers
 
 Bluejeans CODE:                    641 252 323
 Bluejeans link: https://bluejeans.com/641252323

Agenda

  • Activity updates
  • DAQ/trigger 60% design review will be Thursday, 18 March, from 2pm to 5pm. Topics are still to be determined.
  • General discussion

Minutes

Participants: B. Moffit, B. Blaikie, D. Bishop, J. Pan, M. Gericke, R. Michaels, W. Gu, P. King

  • Discussion of the DAQ/trigger 60% design review
    • Plan to have an update on the ADC design, integration mode requirements, and an overview talk. Michael, Bob, and Paul will have a follow up discussion to set the agenda
    • Michael proposes two aspects to the review: is the technical equipment sufficient to meet the requirements; and are the interfaces well defined.
  • Grounding discussion
    • Likely the ADC ground shield will be in common on each module
    • We look at Michael's signal/grounding diagram. In order to avoid ground-loops we should break the ground connection either just before the ADC input or just after the preamp
    • Discussion seems to converge on the idea that the ground of the ground of the preamp should be connected back to the PMT/HV ground, and the output ground from the preamp would *not* be connected to the twin-ax cable ground shield. The twin-ax ground shield would be connected to the integrator ground.