Difference between revisions of "Optics Meeting Jun 28 2022 230PM ET"

From Moller Wiki
Jump to: navigation, search
(Agenda)
(Agenda)
 
(7 intermediate revisions by 3 users not shown)
Line 6: Line 6:
  
 
=Agenda=
 
=Agenda=
1. Update on sieve and blocker engineering [Kate]
+
1. Update on sieve and blocker engineering [Kate] [https://moller.jlab.org/wiki/index.php/File:MOLLER_Blocker_Sieve_Engineering.pdf]
  
2. Understanding the E' vs gem r plot in more details
+
2. Understanding the E' vs gem r plot in more details [Vassu][https://moller.jlab.org/wiki/index.php/File:Understanding_the_scattered_electron_momentum_vs_gem_r_plot_update.pdf]
  
3. Sieve Hole Locations Update
+
3. Sieve Hole Locations Update [Vassu][https://moller.jlab.org/wiki/index.php/File:Sieve_Hole_Locations_update.pdf]
  
4. Understanding the generators in remoll
+
4. Understanding the generators in remoll [Vassu][https://moller.jlab.org/wiki/index.php/File:Generators_in_Remoll.pdf]
 +
 
 +
5. Update on GEM efficiency map [Nathan]
  
 
=Attendance=
 
=Attendance=
 +
Vassu, Nathan, Zuhal, Bill, Brynna, James, Kent, Ciprian, Kate
  
 
=Minutes=
 
=Minutes=
 +
Kate:
 +
* Sieve and blocker will now be 100mm thick unless our hole size study requires holes smaller than 5mm.
 +
* The sieve should be placed at a different z location than we've been using. Some basic calculations should be redone to check that we don't need to change important aspects of sieve design.
 +
Nathan:
 +
* Initial look at GEM efficiency map looks good.
 +
* Next steps are to add in curves on the outer edges, make more realistically sized ribs, and define a more accurate function for the efficiency.
 +
Vasu:
 +
* The vertical band on the E' plot looks to be coming from something between drift 2 and upstream of shielding.
 +
* v_z reconstruction using sieve_r can be used to define necessary radial separation for sieve holes.
  
 
=Meeting link information=
 
=Meeting link information=

Latest revision as of 14:52, 11 July 2022

Back to Main Page >> Optics Meetings

>> following meeting

>> previous meeting

Agenda

1. Update on sieve and blocker engineering [Kate] [1]

2. Understanding the E' vs gem r plot in more details [Vassu][2]

3. Sieve Hole Locations Update [Vassu][3]

4. Understanding the generators in remoll [Vassu][4]

5. Update on GEM efficiency map [Nathan]

Attendance

Vassu, Nathan, Zuhal, Bill, Brynna, James, Kent, Ciprian, Kate

Minutes

Kate:

  • Sieve and blocker will now be 100mm thick unless our hole size study requires holes smaller than 5mm.
  • The sieve should be placed at a different z location than we've been using. Some basic calculations should be redone to check that we don't need to change important aspects of sieve design.

Nathan:

  • Initial look at GEM efficiency map looks good.
  • Next steps are to add in curves on the outer edges, make more realistically sized ribs, and define a more accurate function for the efficiency.

Vasu:

  • The vertical band on the E' plot looks to be coming from something between drift 2 and upstream of shielding.
  • v_z reconstruction using sieve_r can be used to define necessary radial separation for sieve holes.

Meeting link information

Meeting URL

https://cwm.zoom.us/j/97259755403?pwd=WTRqVHJnZ3RQa1IwNHdMQjJuQm9FZz09

Meeting ID: 972 5975 5403

Passcode: 4937




Return to Optics Meetings
Return to Main Page