Difference between revisions of "Main Page"
From Moller Wiki
(→Documentation) |
(→Working Groups) |
||
(2 intermediate revisions by 2 users not shown) | |||
Line 25: | Line 25: | ||
* [https://hallaweb.jlab.org/wiki/index.php/MOLLER_Tosca_Simulations MOLLER Tosca Simulations] | * [https://hallaweb.jlab.org/wiki/index.php/MOLLER_Tosca_Simulations MOLLER Tosca Simulations] | ||
* [[MOLLER GEANT4 Simulations]] | * [[MOLLER GEANT4 Simulations]] | ||
− | * [[Accessing Document Control]] | + | * MOLLER Drawings and Documents |
+ | ** [[Accessing Document Control]] | ||
+ | ** Spectrometer Drawing Number Index [https://jeffersonlab.sharepoint.com/:x:/r/sites/MOLLER/Shared%20Documents/Spectrometer/Moller_Spectrometer_Drawing_Number_Index_v1_24-07-17.xlsx?d=wa7e3f87eb48b44bf97d8a1db73119f04&csf=1&web=1&e=1ULEck ( Sharepoint, latest posted July 17, 2024) ] | ||
== Working Groups == | == Working Groups == | ||
Line 38: | Line 40: | ||
* [[Project Tracking]] | * [[Project Tracking]] | ||
* [[Physics]] | * [[Physics]] | ||
+ | * [[Data Acquisition (DAQ)]] | ||
* [[Analysis Software]] | * [[Analysis Software]] | ||
* [[Target]] | * [[Target]] |
Latest revision as of 13:47, 22 July 2024
Welcome to the MOLLER at 11 GeV E12-09-005 Wiki
Contents
[hide]Meetings
Weekly meetings calendar (public link)
Using the weekly meetings calendar
Collaboration | Simulation | Integrating Detector | Project Tracking | Spectrometer | Analysis | Physics | Data Acquisition | Optics |
---|
Documentation
- MOLLER Experiment Web Site
- MOLLER MIE SharePoint
- MOLLER Documents (DocDB at SBU) (the old JLab version)
- MOLLER Spectrometer ELOG
- MOLLER Tosca Simulations
- MOLLER GEANT4 Simulations
- MOLLER Drawings and Documents
- Accessing Document Control
- Spectrometer Drawing Number Index ( Sharepoint, latest posted July 17, 2024)
Working Groups
- Spectrometer
- Integrating Detectors
- Background and Tracking Detectors
- Detector Mechanics (including GEM Rotator)
- Pion Backgrounds
- Simulations
- Beam Monitoring
- Project Tracking
- Physics
- Data Acquisition (DAQ)
- Analysis Software
- Target
- Tolerance and alignment
- Kinematics and Magnetic Optics
- Ad Hoc Committee on Ferrous Materials
- Installation
- Technical Board