Difference between revisions of "Main Page"
From Moller Wiki
(→Documentation) |
|||
Line 24: | Line 24: | ||
* [https://hallaweb.jlab.org/wiki/index.php/MOLLER_Tosca_Simulations MOLLER Tosca Simulations] | * [https://hallaweb.jlab.org/wiki/index.php/MOLLER_Tosca_Simulations MOLLER Tosca Simulations] | ||
* [[MOLLER GEANT4 Simulations]] | * [[MOLLER GEANT4 Simulations]] | ||
+ | * [[Accessing Document Control]] | ||
== Working Groups == | == Working Groups == |
Revision as of 21:27, 26 July 2023
Welcome to the MOLLER at 11 GeV E12-09-005 Wiki
Contents
[hide]Meetings
Weekly meetings calendar (public link)
Using the weekly meetings calendar
Collaboration | Simulation | Integrating Detector | Project Tracking | Spectrometer | Analysis | Physics | Data Acquisition | Optics |
---|
Documentation
- MOLLER Experiment Web Site
- MOLLER MIE SharePoint
- MOLLER Documents (DocDB)
- MOLLER Spectrometer ELOG
- MOLLER Tosca Simulations
- MOLLER GEANT4 Simulations
- Accessing Document Control
Working Groups
- Spectrometer
- Integrating Detectors
- Background and Tracking Detectors
- Detector Mechanics (including GEM Rotator)
- Pion Backgrounds
- Simulations
- Beam Monitoring
- Project Tracking
- Physics
- Analysis Software
- Target
- Tolerance and alignment
- Kinematics and Magnetic Optics
- Ad Hoc Committee on Ferrous Materials
- Installation
- Technical Board