Difference between revisions of "IntegrationDaq 230407"
From Moller Wiki
(Created page with "__NOTOC__ Back to Main Page >> Data Acquisition Meetings >> Integrating mode DAQ meetings In...") |
(→Minutes) |
||
Line 26: | Line 26: | ||
== Minutes == | == Minutes == | ||
− | Recording at zoomgov: | + | Recording at zoomgov: [https://jlab-org.zoomgov.com/rec/share/SNUtuXhTGaeYpUUjPpmojTad0C2CwZe5P3WHhPNR59Am7__LMbQjGbrpTcnFpn74.QDfldnynHII7Z0Z2?startTime=1680883057000] |
− | Participants: | + | Participants: R. Michaels, B. Moffitt, P. King, D. McNulty, M. Gericke, W. Gu, S. Chatterjee, J. Fast |
+ | |||
+ | * Michael and Brynne have been setting up for more ADC tests, but Brynne has been out the past few days | ||
+ | * Michael asks about the shipment of the TIpcie; Bob will check with shipping and receiving | ||
+ | * Bryan mentions to Bob that there is a new version of the VTP firmware and library available | ||
+ | * William would like to set up the integrator test stand to look more like what we have planned, with a long fiber between the TImaster and the TIbridge | ||
+ | * Dustin is starting to work with the ADC using the standalone DAQ system; we discuss how he can read out long runs |
Latest revision as of 15:55, 21 April 2023
Back to Main Page >> Data Acquisition Meetings >> Integrating mode DAQ meetings
previous meeting << >> following meeting
Meeting information
Meeting time: 12:00pm Eastern Zoom connection information Join ZoomGov Meeting https://jlab-org.zoomgov.com/j/1603800887?pwd=aXVmSnN6aWZWN3RBdXB4RUhGckZJdz09 Meeting ID: 160 380 0887 Passcode: 903612 US Tool free phone: (833) 568 8864 Find your local number: https://jlab-org.zoomgov.com/u/ab8341cjcG
Agenda
- Activity updates
- General discussion
Open Issues to be followed up later
- Discussions with M. Pitt & J. Musson to understand the beam monitor signals we'll be getting
- Draft timing diagram: DocDB 790
- Michael, Bob, Brynne, and Paul should put together a list of the integrator running modes we would like to have available
Minutes
Recording at zoomgov: [1]
Participants: R. Michaels, B. Moffitt, P. King, D. McNulty, M. Gericke, W. Gu, S. Chatterjee, J. Fast
- Michael and Brynne have been setting up for more ADC tests, but Brynne has been out the past few days
- Michael asks about the shipment of the TIpcie; Bob will check with shipping and receiving
- Bryan mentions to Bob that there is a new version of the VTP firmware and library available
- William would like to set up the integrator test stand to look more like what we have planned, with a long fiber between the TImaster and the TIbridge
- Dustin is starting to work with the ADC using the standalone DAQ system; we discuss how he can read out long runs