Difference between revisions of "IntegrationDaq 230407"

From Moller Wiki
Jump to: navigation, search
(Created page with "__NOTOC__ Back to Main Page >> Data Acquisition Meetings >> Integrating mode DAQ meetings In...")
 
(Minutes)
 
Line 26: Line 26:
  
 
== Minutes ==
 
== Minutes ==
Recording at zoomgov:   
+
Recording at zoomgov:  [https://jlab-org.zoomgov.com/rec/share/SNUtuXhTGaeYpUUjPpmojTad0C2CwZe5P3WHhPNR59Am7__LMbQjGbrpTcnFpn74.QDfldnynHII7Z0Z2?startTime=1680883057000]
  
Participants:
+
Participants: R. Michaels, B. Moffitt, P. King, D. McNulty, M. Gericke, W. Gu, S. Chatterjee, J. Fast
 +
 
 +
*  Michael and Brynne have been setting up for more ADC tests, but Brynne has been out the past few days
 +
*  Michael asks about the shipment of the TIpcie; Bob will check with shipping and receiving
 +
*  Bryan mentions to Bob that there is a new version of the VTP firmware and library available
 +
*  William would like to set up the integrator test stand to look more like what we have planned, with a long fiber between the TImaster and the TIbridge
 +
*  Dustin is starting to work with the ADC using the standalone DAQ system; we discuss how he can read out long runs

Latest revision as of 15:55, 21 April 2023

Back to Main Page >> Data Acquisition Meetings >> Integrating mode DAQ meetings

previous meeting << >> following meeting

Meeting information

 Meeting time:  12:00pm Eastern
 
 Zoom connection information
 Join ZoomGov Meeting
 https://jlab-org.zoomgov.com/j/1603800887?pwd=aXVmSnN6aWZWN3RBdXB4RUhGckZJdz09
 
 Meeting ID: 160 380 0887
 Passcode: 903612
 US Tool free phone: (833) 568 8864
 Find your local number: https://jlab-org.zoomgov.com/u/ab8341cjcG

Agenda

  • Activity updates
  • General discussion

Open Issues to be followed up later

  1. Discussions with M. Pitt & J. Musson to understand the beam monitor signals we'll be getting
  2. Draft timing diagram: DocDB 790
  3. Michael, Bob, Brynne, and Paul should put together a list of the integrator running modes we would like to have available

Minutes

Recording at zoomgov: [1]

Participants: R. Michaels, B. Moffitt, P. King, D. McNulty, M. Gericke, W. Gu, S. Chatterjee, J. Fast

  • Michael and Brynne have been setting up for more ADC tests, but Brynne has been out the past few days
  • Michael asks about the shipment of the TIpcie; Bob will check with shipping and receiving
  • Bryan mentions to Bob that there is a new version of the VTP firmware and library available
  • William would like to set up the integrator test stand to look more like what we have planned, with a long fiber between the TImaster and the TIbridge
  • Dustin is starting to work with the ADC using the standalone DAQ system; we discuss how he can read out long runs