Difference between revisions of "IntegrationDaq 220826"

From Moller Wiki
Jump to: navigation, search
(Created page with "__NOTOC__ Back to Main Page >> Data Acquisition Meetings >> Integrating mode DAQ meetings In...")
 
(Minutes)
 
(One intermediate revision by the same user not shown)
Line 18: Line 18:
 
== Agenda ==
 
== Agenda ==
 
*  Activity updates
 
*  Activity updates
**  Possible chassis design by Armen (JLab)
 
 
*  General discussion
 
*  General discussion
  
Line 27: Line 26:
  
 
== Minutes ==
 
== Minutes ==
Recording at zoomgov:   
+
Recording at zoomgov:  [https://jlab-org.zoomgov.com/rec/share/fEUUqc6aj3j-bp50XhMCNqHbnS1Bo56guNzqQIyNTkT2Ls8dfalNKHE6ScmbxL3G.Zxm5ZOAD-fozEQTt?startTime=1661529198000]
  
Participants:
+
Participants: W. Gu, P. King, B. Blaikie, B. Moffit, B. Shaw, D. McNulty, D. Bishop, C. Zorn, M. Gericke
 +
 
 +
*  William has not received the integrator modules yet.  Paul will check with Bob about the progress on getting the board in the chassis.
 +
*  Bryerton has received the register information from Bryan which is needed to test the TI-slave functionality.  He plans to test it later today
 +
*  Daryl reports that he has not yet done the input-stage modifications for the two boards to be sent to Mainz and to Dustin.  He'll get to that next week
 +
*  Michael has received all of the SOMs.  He asks about what QA tests he should do.
 +
**  He'll install them one-by-one on the ADC board and then try to boot them up, test the QSFP interfaces, and execute the test pattern mode on the ADCs.
 +
*  Jie has submitted another set of the base+dual amps for fabrication
 +
**  These have some minor changes as compared to the previous round of prototypes.
 +
**  Michael anticipates that this would be the last round of prototypes tested solely at Manitoba.  They would go out to other collaborators for further testing and feedback
 +
**  After the meeting, Michael sent an email out to the detector list to see how many to make, and who would like to get some for testing.

Latest revision as of 19:26, 26 August 2022

Back to Main Page >> Data Acquisition Meetings >> Integrating mode DAQ meetings

previous meeting << >> following meeting

Meeting information

 Meeting time:  12:00pm Eastern
 
 Zoom connection information
 Join ZoomGov Meeting
 https://jlab-org.zoomgov.com/j/1603800887?pwd=aXVmSnN6aWZWN3RBdXB4RUhGckZJdz09
 
 Meeting ID: 160 380 0887
 Passcode: 903612
 US Tool free phone: (833) 568 8864
 Find your local number: https://jlab-org.zoomgov.com/u/ab8341cjcG

Agenda

  • Activity updates
  • General discussion

Open Issues to be followed up later

  1. Discussions with M. Pitt & J. Musson to understand the beam monitor signals we'll be getting
  2. Draft timing diagram: DocDB 790
  3. Michael, Bob, Brynne, and Paul should put together a list of the integrator running modes we would like to have available

Minutes

Recording at zoomgov: [1]

Participants: W. Gu, P. King, B. Blaikie, B. Moffit, B. Shaw, D. McNulty, D. Bishop, C. Zorn, M. Gericke

  • William has not received the integrator modules yet. Paul will check with Bob about the progress on getting the board in the chassis.
  • Bryerton has received the register information from Bryan which is needed to test the TI-slave functionality. He plans to test it later today
  • Daryl reports that he has not yet done the input-stage modifications for the two boards to be sent to Mainz and to Dustin. He'll get to that next week
  • Michael has received all of the SOMs. He asks about what QA tests he should do.
    • He'll install them one-by-one on the ADC board and then try to boot them up, test the QSFP interfaces, and execute the test pattern mode on the ADCs.
  • Jie has submitted another set of the base+dual amps for fabrication
    • These have some minor changes as compared to the previous round of prototypes.
    • Michael anticipates that this would be the last round of prototypes tested solely at Manitoba. They would go out to other collaborators for further testing and feedback
    • After the meeting, Michael sent an email out to the detector list to see how many to make, and who would like to get some for testing.