Difference between revisions of "IntegrationDaq 210908"
From Moller Wiki
(→Agenda) |
(→Minutes) |
||
Line 30: | Line 30: | ||
== Minutes == | == Minutes == | ||
''Recording on Bluejeans.com:'' | ''Recording on Bluejeans.com:'' | ||
+ | |||
+ | Absent: M. Gericke, C. Cuevas, B. Shaw, D. Bishop | ||
Participants: | Participants: |
Revision as of 18:42, 8 September 2021
Back to Main Page >> Data Acquisition Meetings >> Integrating mode DAQ meetings
previous meeting << >> following meeting
Meeting information
Meeting time: 3:00pm Eastern BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 Other BlueJeans access phone numbers are listed at https://www.bluejeans.com/premium-numbers Bluejeans CODE: 385 600 867 Bluejeans link: https://bluejeans.com/385600867
Agenda
- Activity updates
- Bob has sent drafts of requirements document and ICD to Paul; plan to circulate these early next week
- Draft timing diagram: DocDB 790
- General discussion
Open Issues to be followed up later
- Need two things by end of August (no hard deadline). Some of this is just cut/paste from existing docs.
- Design requirements document -- examples and template : http://userweb.jlab.org/~rom/mollerdaq/design
- ICD -- interface control document(s). -- apparently Robin Wines made a template and it's on sharepoint. It seems we need several of these (infrastructure to DAQ; detectors to DAQ, etc).
- Discussions with M. Pitt & J. Musson to understand the beam monitor signals we'll be getting
- Create a timing diagram showing the integration gates in the injector and hall, helicity transitions, etc.
Minutes
Recording on Bluejeans.com:
Absent: M. Gericke, C. Cuevas, B. Shaw, D. Bishop
Participants: