Difference between revisions of "Spectrometer"

From Moller Wiki
Jump to: navigation, search
Line 17: Line 17:
 
== Milestones ==  
 
== Milestones ==  
 
# [[hybrid/segmented downselect]] - November 15
 
# [[hybrid/segmented downselect]] - November 15
 
+
# [[collimators]] (mid- December)
 
+
# Collimators (mid- December)
+
 
## collimator 1, 2 merge
 
## collimator 1, 2 merge
 
## hot spots on upstream
 
## hot spots on upstream
Line 27: Line 25:
 
## collimator 5 (including "septapus" for shielding)
 
## collimator 5 (including "septapus" for shielding)
  
# Review irradiation papers by mid-December
+
# [[Review irradiation papers]] by mid-December
 
## Cip, KK, Kent, Juliette
 
## Cip, KK, Kent, Juliette
 
## Can we live with higher doses on the epoxy than we have been assuming?
 
## Can we live with higher doses on the epoxy than we have been assuming?

Revision as of 17:22, 2 November 2020

MOLLER Wiki
MOLLER page
DocDB
Project
Teleconferences
Bluejeans

Milestones

  1. hybrid/segmented downselect - November 15
  2. collimators (mid- December)
    1. collimator 1, 2 merge
    2. hot spots on upstream
      1. W plate
      2. optimize the 2-bounce shield (Chandan, Naz)
    3. collimator 4 (resculpting)
    4. collimator 5 (including "septapus" for shielding)
  1. Review irradiation papers by mid-December
    1. Cip, KK, Kent, Juliette
    2. Can we live with higher doses on the epoxy than we have been assuming?
    3. Do we trust the results?
    4. Are the energies/species close enough?
  1. beam pipes and enclosures - are major changes required? - Start mid-December
    1. upstream enclosure and pipes (mid-December)
    2. clean beam transport due to the SAMs intrusions into the pipe
      1. Cip has a student designing the SAM intrusions
    3. aperture in the dump tunnel
  1. Supports at low radius
    1. inter-coil supports "under" the envelopes
    2. now 2-bounce shield is load bearing?
    3. DS torus "2-bounce" not needed, but septapus for shielding
  1. Specifications document
    1. KK and Juliette will look at red text
    2. We should meet to discuss these
  1. Nomenclature documented (and used consistently)

Working Group Members

  • Internal Working Group
  • External Working Group
  • Review Committee Members
text
The MOLLER spectrometer in TOSCA
text
Layout of the hybrid torus conductor





old wiki