Difference between revisions of "Spectrometer"

From Moller Wiki
Jump to: navigation, search
Line 11: Line 11:
 
|-
 
|-
 
| [[Spectrometer_Meetings|Teleconferences]]
 
| [[Spectrometer_Meetings|Teleconferences]]
 +
|-
 +
| [https://bluejeans.com/7346097559 Bluejeans]
 
|}
 
|}
  
 
+
{| cellpadding=5 style="margin:7px 30px 0 30px; <!--
  BlueJeans calling instructions:
+
  --> float:right; border:1px solid #AA6633"
  Toll-Free Number (U.S.&  Canada): 888-240-2560
+
|- bgcolor="#fbfeff"
  International toll number:         408-740-7256
+
| [[File:Both toroids.PNG|thumb|upright=2.5|alt=text|The MOLLER spectrometer in TOSCA]]
  Bluejeans CODE:                   734 609 7559
+
|-
  Bluejeans link: https://bluejeans.com/7346097559
+
|[[File:Layout.png|thumb|upright=2.5|alt=text|Layout of the hybrid torus conductor]]
 +
|}
  
  
  
[[File:Both toroids.PNG|thumb|upright=2.5|alt=text|The MOLLER spectrometer in TOSCA]]
 
[[File:Layout.png|thumb|upright=2.5|alt=text|Layout of the hybrid torus conductor]]
 
  
 
== Milestones ==  
 
== Milestones ==  

Revision as of 17:18, 2 November 2020

MOLLER Wiki
MOLLER page
DocDB
Project
Teleconferences
Bluejeans
text
The MOLLER spectrometer in TOSCA
text
Layout of the hybrid torus conductor



Milestones

  1. hybrid/segmented downselect - November 15


  1. Collimators (mid- December)
    1. collimator 1, 2 merge
    2. hot spots on upstream
      1. W plate
      2. optimize the 2-bounce shield (Chandan, Naz)
    3. collimator 4 (resculpting)
    4. collimator 5 (including "septapus" for shielding)
  1. Review irradiation papers by mid-December
    1. Cip, KK, Kent, Juliette
    2. Can we live with higher doses on the epoxy than we have been assuming?
    3. Do we trust the results?
    4. Are the energies/species close enough?
  1. beam pipes and enclosures - are major changes required? - Start mid-December
    1. upstream enclosure and pipes (mid-December)
    2. clean beam transport due to the SAMs intrusions into the pipe
      1. Cip has a student designing the SAM intrusions
    3. aperture in the dump tunnel
  1. Supports at low radius
    1. inter-coil supports "under" the envelopes
    2. now 2-bounce shield is load bearing?
    3. DS torus "2-bounce" not needed, but septapus for shielding
  1. Specifications document
    1. KK and Juliette will look at red text
    2. We should meet to discuss these
  1. Nomenclature documented (and used consistently)