Tuesday, September 4, 2018 2:30pm ET

From Moller Wiki
Jump to: navigation, search

previous meeting << >> following meeting

Logistic information

 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560
 International toll number:         408-740-7256
 Bluejeans CODE:                    734 609 7559
 Bluejeans link: https://bluejeans.com/7346097559

Agenda

  1. Prototype testing report (Ernie, Sandesh)
    1. MIT testing results
    2. Everson Tesla testing results
    3. test plan


Minutes

Attendance: Probir, Sandesh, KK, Kent, Juliette,

  1. Thia pushing for dimensions of inner beampipe
    1. photon envelopes - collimator 1 is not sufficient to shield the coils
    2. eliminated collimator 3 - did this cause the issue?
  2. Prototype testing report
    1. Sandesh worked with Ernie to create test plan
    2. Ernie shared the Emerson-Tesla test results and his preliminary calculations
    3. talks about number of techs, etc.
    4. need some hardware
      1. water leads
      2. electrical cables
      3. DAQ systems
      4. Power supply - fuses etc.
      5. need technician time
    5. How to move forward...
      1. start with single coil tests
      2. may be able to try to connect them in series (can't power to full power)
      3. need technician time priority
      4. need to produce results soon
      5. need to secure coil with 2x4 or 2x6 frames
      6. the epoxy should hold
      7. wooden bench with non-magnetic stuff
  3. Comparing results
    1. Sandesh gets a lower flow rate for given pressure drop
    2. He will continue with checking the calculations
  4. Preparations for CD1/Director's review
    1. phone call September 17th
    2. review scheduled by end of Fall
  5. Meetings
    1. Thursdays at 11:00am ET
    2. Next meeting September 20





Return to Spectrometer Meetings