Monday, June 12, 2023 9am ET

From Moller Wiki
Jump to: navigation, search

previous meeting << >> following meeting

 Zoom calling instructions: See email


Standing Agenda

Urgent Items (Please inform Juliette or Mike about items to be added here)

Status Reports not covered by urgent items

  • JLAB
  • MIT
  • UVa
  • Manitoba

Business arising from Status Reports

Minutes

Attendance

Urgent Items (Please inform Juliette or Mike about items to be added here)

Status Reports not covered by urgent items

  • JLAB
    • 2/3 tentative dates Aug 14-18, 2023. Schedule for presentations and content here:

2 3 schedule.png

    • CD-3a procurements:
      • DS Enclosure in management approval, DS tie rod ends one vendor response, Toroid ceramics breaks are buyer assigned.
  • MIT: Ernie presented revised sectioned design of 2-bounce shield.
    • Requested slides with additional image with details of inner overlap and screw detail.
    • Request thermal and mechanical analysis of revised design.
      • There may be an existing analysis of the heat transfer of the 2-bounce to the coils.
  • UVa
  • Manitoba: Sakib presented simulation results on the US support structure. 16W summed over the supports w/ 70 uA integrated current. Not generating any background of concern.

Business arising from status reports

Navigation

Return to Spectrometer Meetings
Return to MOLLER Wiki Main Page