Monday, June 5, 2023 9am ET

From Moller Wiki
Jump to: navigation, search

previous meeting << >> following meeting

 Zoom calling instructions: See email


Standing Agenda

Urgent Items (Please inform Juliette or Mike about items to be added here)


Status Reports not covered by urgent items

  • JLAB
  • MIT
  • UVa
  • Manitoba

Business arising from Status Reports

Minutes

Attendance

Urgent Items (Please inform Juliette or Mike about items to be added here)

  • Power supplies capabilities
    • +/-20% of nominal should be possible
    • SCR - stupidly inefficient at anything but the operating current
    • don't have to re-tap to go low (down to 50%)
    • stability and losses will be increased +/- 1A
    • could, in principle, adjust the temperature to keep the the temperature the same
      • still have the control valves for the controlling the temperature
      • keep an eye on this - make sure this stays
    • make it work 24/7 as low as 10.6 GeV no problem
    • ramp rate
      • immediate - mH of inductance
      • depends on the monitoring of water temperature
    • minimum
      • 5 V may be the limiting factor in the low current
      • 300 A in US and 500 A in DS
  • Mapping
    • Probir and Juliette will meet separately
    • will need a lexan box around the magnet in order to power it
    • will need passthrus for the mapping system


Status Reports not covered by urgent items

  • JLAB
    • Dave's visit to ET
      • he was able to come back after 2 days
      • new guy from original, but he was good - had good relevant experience
      • shiny and unshiny spots - due to unflatness of spool - rollers
      • clean, tape, wind,
      • not full half-lap (60-80%)
      • tension block, rollers to guide
  • MIT
  • UVa
  • Manitoba


Business arising from status reports