Urgent Items (Please inform Juliette or Mike about items to be added here)
Status Reports not covered by urgent items
- JLAB
- MIT
- UVa
- Manitoba
Business arising from Status Reports
Minutes
Attendance
Urgent Items (Please inform Juliette or Mike about items to be added here)
- Power supplies capabilities
- +/-20% of nominal should be possible
- SCR - stupidly inefficient at anything but the operating current
- don't have to re-tap to go low (down to 50%)
- stability and losses will be increased +/- 1A
- could, in principle, adjust the temperature to keep the the temperature the same
- still have the control valves for the controlling the temperature
- keep an eye on this - make sure this stays
- make it work 24/7 as low as 10.6 GeV no problem
- ramp rate
- immediate - mH of inductance
- depends on the monitoring of water temperature
- minimum
- 5 V may be the limiting factor in the low current
- 300 A in US and 500 A in DS
- Mapping
- Probir and Juliette will meet separately
- will need a lexan box around the magnet in order to power it
- will need passthrus for the mapping system
Status Reports not covered by urgent items
- JLAB
- Dave's visit to ET
- he was able to come back after 2 days
- new guy from original, but he was good - had good relevant experience
- shiny and unshiny spots - due to unflatness of spool - rollers
- clean, tape, wind,
- not full half-lap (60-80%)
- tension block, rollers to guide
- Dave's visit to ET
- MIT
- UVa
- Manitoba