IntegrationDaq 240308
From Moller Wiki
Back to Main Page >> Data Acquisition Meetings >> Integrating mode DAQ meetings
previous meeting << >> following meeting
Meeting information
Meeting time: 1:00pm Eastern Zoom connection information is sent out by email; please reach out to Paul if you don't have the current link.
Agenda
- Activity updates
- General discussion
Open Issues to be followed up later
- Discussions with M. Pitt & J. Musson to understand the beam monitor signals we'll be getting
- Draft timing diagram: DocDB 790
- Michael, Bob, Brynne, and Paul should put together a list of the integrator running modes we would like to have available
Minutes
Recording at zoomgov:
Participants: R. Michaels, P. King, B. Moffit, A. Sen. W. Gu, B. Blaikie, S. Chatterjee, J. Pan, M. Gericke, D. McNulty, B. Shaw, D. Bishop, S. Regmi, K. Dehmelt
- Status of the specification document
- I've put a little time into the specification document, and Bob had made a few suggestions. We'll try to have an email discussion about this in the next two weeks.
- Bryan does not have any progress to report. Bryerton has pushed an update to help with the TI readout, but Bryan hasn't had a chance to try it yet
- Bryerton is working on the QFSP data port, he has some issues with the rev.1 board and he's diagnosing them now.
- Michael presents a few slides on his plans for cross-talk testing: inject an asymmetry signal into one channel and monitor the other channels for pickup of the asymmetry.
- Brynne will set up a DC input signal for the channels being monitored, and then run all the boards through this test