Agenda

  • Activity updates
  • General discussion

Open Issues to be followed up later

  1. Discussions with M. Pitt & J. Musson to understand the beam monitor signals we'll be getting
  2. Draft timing diagram: DocDB 790
  3. Michael, Bob, Brynne, and Paul should put together a list of the integrator running modes we would like to have available

Minutes

Recording at zoomgov:

Participants: R. Michaels, P. King, W. Gu, B. Blaikie, B. Moffit, K. Dehmelt, C. Cuevas, J. Pan, D. McNulty, M. Gericke, S. Regmi, A. Sen, D. Bishop

  • Activity updates
    • Bryan does not have an update on the readout work
    • Bryerton is on vacation this week; he'll be back next week
    • Michael has made a little progress on testing the prototype 2 modules, but is having some issues with his PoE switch.
    • Daryl reports that the two new boards at TRIUMF have been tested and all ADCs are working on both boards
      • They have not tested the effect of installing the EM covers over the channels
      • They have not yet done the cross-talk tests on the revision 2 board
    • Michael (and the others) have not made much progress on the specification document
      • I'll try to put some time on the Overleaf document over the next two weeks
    • JLab will be buying the ADC chassis. The design updates have been given to Chris and Armen, and the plan would be to make one chassis to do a test-fit on the prototype 2 board, and then produce the rest of the chassis.
  • Bob has met with the work coordinator to discuss the new work space in the test lab. He has a plan for how to build it up for the tests we need to do
  • Bob and Chris will get together next week to look at where the CHA-to-hall fiber trunk might terminate in the SBS bunker
  • Paul will pull together the channel and length information for the GEM & HVMAPS fiber runs to discuss with Bob, Michael and Chris