IntegrationDaq 220225

From Moller Wiki
Jump to: navigation, search

Back to Main Page >> Data Acquisition Meetings >> Integrating mode DAQ meetings

previous meeting << >> following meeting

Meeting information

 Meeting time:  12:00pm Eastern
 
 Zoom connection information
 Join ZoomGov Meeting
 https://jlab-org.zoomgov.com/j/1603800887?pwd=aXVmSnN6aWZWN3RBdXB4RUhGckZJdz09
 
 Meeting ID: 160 380 0887
 Passcode: 903612
 US Tool free phone: (833) 568 8864
 Find your local number: https://jlab-org.zoomgov.com/u/ab8341cjcG

Agenda

  • Follow-up from last meeting
    • Ben had emailed suggestion about using Comblock 10Gbps IP instead of Xilinx 10Gbps IP
    • Do we need to have the ability to adjust trigger delay for different channels in the same module, such as for beamline devices at different locations? One ADC sample period (68 ns) corresponds to a distance (c*t) of 20 meters; we might have devices separated by this distance (or with similar cable delay). But, note that we had previously thought that ~100ns timing differences weren't a big deal
    • Further discussion of the integrator running modes?
  • Activity updates
  • General discussion

Open Issues to be followed up later

  1. Discussions with M. Pitt & J. Musson to understand the beam monitor signals we'll be getting
  2. Draft timing diagram: DocDB 790
  3. Michael, Bob, Brynne, and Paul should put together a list of the integrator running modes we would like to have available

Minutes

Recording at zoomgov: [1]

Participants: