IntegrationDaq 210423

From Moller Wiki
Jump to: navigation, search

Back to Main Page >> Data Acquisition Meetings >> Integrating mode DAQ meetings

previous meeting << >> following meeting

Meeting information

 Meeting time:  3:30pm Eastern
 
 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560
 Other BlueJeans access phone numbers are listed at https://www.bluejeans.com/premium-numbers
 
 Bluejeans CODE:                    641 252 323
 Bluejeans link: https://bluejeans.com/641252323

Agenda

  • Activity updates
  • General discussion

Minutes

Recording on Bluejeans.com: [1]

Participants: B. Moffit, C. Cuevas, W. Gu, M. Gericke, J. Pan, B. Blaikie, B. Shaw, D. Bishop, P. King

  • Activity updates
    • Daryl is a good way through the board layout, but needs a few more weeks to finish
    • Jie is working on PE tests at various HV settings with the new PMT base
    • Chris is going to follow up with Brad Cumbia and Jesse about the route for the fiber cable from the ISB to the hall for the TI-bridge connection
    • Michael has gotten a quote from Enclustra for the SOM and is working up the procurement request. He expects to do a sole-source justification
      • Daryl also suggests to inquiring about the ADCs in the full quantity we need.
  • General discussion about grounding plans
    • I will look for documentation about the Qweak grounding.
      • Late update: there are not any documents describing how the grounding was done for Qweak. There are some documents describing the tests for helicity signal pickup we had done. I'll collect links for those.
    • We have a discussion about the relative location of the integrator modules and the HV modules.
      • Late update: per Javier and Dustin, the high voltage modules are planned to be in the SBS bunker along with the integrators. Maybe the low voltage supplies will also be there.