CountingDaq 240315
From Moller Wiki
Back to Main Page >> Data Acquisition Meetings >> Counting mode DAQ meetings
previous meeting << >> following meeting
Meeting information
Meeting time: 1:00pm Eastern Zoom connection information is sent out by email; please reach out to Paul if you don't have the current link.
Agenda
- Activity updates
- General discussion
Minutes
Recording on Zoom: https://jlab-org.zoomgov.com/rec/share/TJcs38L9g5u8D8BW64cCME02phmW-irxQb0BifEWrk9DYIF07QoMO0Di-70rQn9w.0WjEjQd7Bm3LgaUf?startTime=1710521112000
Participants: S. Malace, P. King, R. Michaels, D. Armstrong, S. Chatterjee, B. Blaikie, A. Sen, S. Regmi, B. Moffit, M. Gericke, D. McNulty, H. Liu
- Activity updates
- Status of the DAQ workspace in the test lab
- The space has been cleaned up. There is about a 15'x20' space.
- Bob says the first things that will be set-up in the test lab will be Hanjie's polarimeter work, and Bob's digital beam monitor tests
- Simona
- Worked on single photoelectron test for the pion detector prototype
- The pion detectors are not using the PMTs that we would use for the experiment. These were use in the pion detector pre-prototype tested at Mainz. They used a commercial base.
- PMT signal is run through a long cable (roughly 75ft) to spread the pulse across several FADC samples. Want to also check it with a short cable to verify the integrals is the same.
- Plans to switch this to use a VTP-based trigger next week
- Running the FADC in sample mode (mode 1) and doing the integrals in analysis
- Using a pulsed LED as the SPE source for the PMT. Ran with three different HV settings and several settings of the LED drive voltage.
- Status of the DAQ workspace in the test lab