Tuesday, October 22, 2019 11am ET

From Moller Wiki
Revision as of 16:44, 22 October 2019 by Crowder (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

previous meeting << >> following meeting

Logistic information

 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560
 International toll number:         408-740-7256
 Bluejeans CODE:                    734 609 7559
 Bluejeans link: https://bluejeans.com/7346097559

Agenda

Minutes

Attendance: Juliette, Ruben, Probir, Sandesh, Randy, KK, Kent, Cip, Sakib, Jim, Ernie, Robin (arrived late)

  • Helium vs. vacuum sims
  • Pugh matrix
    • Went over line by line
    • vacuum - 10-5 - 10-4 Torr b/c of Paschen curve
  • Next steps
    • Document the Pugh matrix
    • Document the physics
    • not yet CD1 but Thia wants to follow change/control process
      • strictly speaking - post-CD1 is when those rules come in
      • good documentation for the physics rules
    • Assuming vacuum case for cost review in November as of now
      • at Dir. Rev. - used He but didn't have the full physics case
      • The cost differential is not as big as feared
    • Assuming hybrid as of now
  • Meetings
    • cost review - Nov. 11-12
    • CDR review - Dec. 12-13
    • Dir. Rev. - Jan. 14-16
    • CD1 review - Feb. ??


Return to Spectrometer Meetings