Pion Meeting October 29 2021 4PM ET
From Moller Wiki
Revision as of 21:14, 29 October 2021 by Wdconinc (Talk | contribs) (Created page with "Back to Main Page >> Pion Meetings * Bluejeans link: [https://bluejeans.com/420107252 420 107 252] * Dial-in: [tel:408-740-7256p420107252# 4...")
Back to Main Page >> Pion Meetings
- Bluejeans link: 420 107 252
- Dial-in: 408-740-7256 (US), 888-240-2560 (US Toll Free), 408-317-9253 (Alternate number)
Agenda
- Updates on pion detector studies (Elham)
- Updates on beam generator (Raj)
Attendance
David, Elham, Wouter, Dustin, Jim, Raj
Minutes
- Updates on pion detector studies (Elham)
- Rotated pion detector for longitudinal design
- 3 layers of 1 inch lucite stacked with PMT longitudinally downstream behind the lead donut
- Photo-electron pi/e ratio is ~7% for newly rotated geometry
- TODO: Verify that the rotation is applied correctly
- TODO: Calculate how many pion we actually see and if we can get the statistical precision needed
- Rotated pion detector for longitudinal design
- Updates on beam generator (Raj)
- Less rate from beam generator than Moller generator in plane after showermax, which is strange
- TODO: Look at radial distribution at detector planes around showermax
- TODO: Look at different particle species: rate from electrons, positrons, etc