Pion Meeting October 29 2021 4PM ET

From Moller Wiki
Revision as of 21:14, 29 October 2021 by Wdconinc (Talk | contribs) (Created page with "Back to Main Page >> Pion Meetings * Bluejeans link: [https://bluejeans.com/420107252 420 107 252] * Dial-in: [tel:408-740-7256p420107252# 4...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Back to Main Page >> Pion Meetings

Agenda

  1. Updates on pion detector studies (Elham)
  2. Updates on beam generator (Raj)

Attendance

David, Elham, Wouter, Dustin, Jim, Raj

Minutes

  • Updates on pion detector studies (Elham)
    • Rotated pion detector for longitudinal design
      • 3 layers of 1 inch lucite stacked with PMT longitudinally downstream behind the lead donut
      • Photo-electron pi/e ratio is ~7% for newly rotated geometry
      • TODO: Verify that the rotation is applied correctly
      • TODO: Calculate how many pion we actually see and if we can get the statistical precision needed
  • Updates on beam generator (Raj)
    • Less rate from beam generator than Moller generator in plane after showermax, which is strange
    • TODO: Look at radial distribution at detector planes around showermax
    • TODO: Look at different particle species: rate from electrons, positrons, etc