=Agenda=
 
=Agenda=
 
* Quartz and PMT purchases for ancillary detectors (Mark Pitt) [https://moller-docdb.physics.sunysb.edu/DocDB/0012/001293/001/Pitt_TBmeeting_jul_30_2024.pdf slides]
 
* Quartz and PMT purchases for ancillary detectors (Mark Pitt) [https://moller-docdb.physics.sunysb.edu/DocDB/0012/001293/001/Pitt_TBmeeting_jul_30_2024.pdf slides]
* Concrete shielding of Upstream Torus region (Ciprian Gal) [https://moller-docdb.physics.sunysb.edu/cgi-bin/DocDBTest/private/ShowDocument?docid=1292 docDB1292]
+
* Concrete shielding of Upstream Torus region (Ciprian Gal)
  
 
=Minutes=
 
=Minutes=
 +
* Quartz and PMT purchases for aux sets:
 +
** MP: request is approval for a large purchase for the auxiliary detectors
 +
** MP: most of the components have been bought for other detectors in the experiment.
 +
** MP: the SAMs will have different tubes; that have worked fine before in similar experimental settings
 +
** CG: spares?
 +
*** MP: counts already have spares in them
 +
** CG: DBM quartz position? Should it not be inside the segment?
 +
*** MP: the quartz is radially in. It is detecting low flux things but it gets to the phototubes but shielded by the segment Pb lip
 +
*** MP: the diffuse background can be picked up the DBM but would be swamped by signal in the quartz of the MD.
 +
** CG: SAM PE yield comparable to what we had in PREX-2/CREX?
 +
*** MP: we are seeing a little larger PE yield (7 in PREX-2/CREX), but the light guide is shorter.
 +
** DMeekins: Is there a way to disable the HV on the tubes on a fault?
 +
*** CG: we can investigate the inclusion of an interlock for the HV mainframe and will get back to DM with the options available.
  
 +
* Concrete shielding change:
 +
** CG: request is made to simplify the procurement process. HD concrete purchasing is proving to be quite difficult and expensive
 +
** RW: side holes?
 +
** CG: will allow for 24h of dissent but otherwise this change is approved
  
 
Next step:
 
Next step:
  
 
=Attendance=
 
=Attendance=
 +
Present:
 +
* Mark Pitt (Deputy Spokesperson, MOLLER-NSF Project Coordinator)
 +
* Ciprian Gal  (L2 CAM: Infrastructure)
 +
* Klaus Dehmelt (Deputy DOE Project Manager)
 +
* David Armstrong (Elected Executive Board Member)
 +
* Mark Jones  (Hall A Leader)
 +
* Ruben Fair (DOE Project Manager)
 +
* Carl Zorn  (L2 CAM: Detectors)
 +
* Paul King  (Working Group Convener: DAQ)
 +
* Dustin McNulty  (Working Group Convener: Integrating Detectors)
 +
* Dave Meekins  (L2 CAM: Target)
 +
* Robin Wines (Project Engineer)
 +
* Paul A Souder (Elected Executive Board Member)
 +
* Nilanga Liyanage  (Working Group Convener: Tracking Detectors)
 +
  
 
Technical board membership:  
 
Technical board membership:  
Line 20: Line 52:
 
* Kent Paschke, Chair (MOLLER Scientific Coordinator)
 
* Kent Paschke, Chair (MOLLER Scientific Coordinator)
 
* Krishna Kumar (MOLLER Spokesperson)
 
* Krishna Kumar (MOLLER Spokesperson)
* Mark Pitt (Deputy Spokesperson, MOLLER-NSF Project Coordinator)
 
* Ruben Fair (DOE Project Manager)
 
* Klaus Dehmelt (Deputy DOE Project Manager)
 
 
* Michael Gericke (MOLLER-CFI Project Coordinator)
 
* Michael Gericke (MOLLER-CFI Project Coordinator)
 
* Juliette Mammei  (Executive Board International Representative)
 
* Juliette Mammei  (Executive Board International Representative)
* Mark Jones  (Hall A Leader)
 
* Paul A Souder (Elected Executive Board Member)
 
* David Armstrong (Elected Executive Board Member)
 
* Robin Wines (Project Engineer)
 
* Dave Meekins  (L2 CAM: Target)
 
 
* Mike Dion (L2 CAM: Spectrometer)
 
* Mike Dion (L2 CAM: Spectrometer)
* Carl Zorn  (L2 CAM: Detectors)
 
* Ciprian Gal  (L2 CAM: Infrastructure)
 
 
* Robert Michaels  (L2 CAM: DAQ)
 
* Robert Michaels  (L2 CAM: DAQ)
 
* Vladimir Berdnikov  (L2 CAM: Installation)
 
* Vladimir Berdnikov  (L2 CAM: Installation)
 
* Silviu Covrig (Working Group Convener: Target)
 
* Silviu Covrig (Working Group Convener: Target)
 
* Caryn Palatchi  (Working Group Convener: Polarized Beam)
 
* Caryn Palatchi  (Working Group Convener: Polarized Beam)
* Dustin McNulty  (Working Group Convener: Integrating Detectors)
 
* Paul King  (Working Group Convener: DAQ)
 
* Nilanga Liyanage  (Working Group Convener: Tracking Detectors)
 
 
* Jim Napolitano (Working Group Convener: Polarimetry)
 
* Jim Napolitano (Working Group Convener: Polarimetry)
 
* Rakitha Beminiwattha (Working Group Convener: Simulations)
 
* Rakitha Beminiwattha (Working Group Convener: Simulations)
 
* Yury Kolomensky (Working Group Convener: Physics Extraction)
 
* Yury Kolomensky (Working Group Convener: Physics Extraction)

Revision as of 20:10, 30 July 2024

Back to Main Page >> Technical Board

Technical Board Meeting June 11, 2024 << >> TBD

Online: see email

Agenda

  • Quartz and PMT purchases for ancillary detectors (Mark Pitt) slides
  • Concrete shielding of Upstream Torus region (Ciprian Gal)

Minutes

  • Quartz and PMT purchases for aux sets:
    • MP: request is approval for a large purchase for the auxiliary detectors
    • MP: most of the components have been bought for other detectors in the experiment.
    • MP: the SAMs will have different tubes; that have worked fine before in similar experimental settings
    • CG: spares?
      • MP: counts already have spares in them
    • CG: DBM quartz position? Should it not be inside the segment?
      • MP: the quartz is radially in. It is detecting low flux things but it gets to the phototubes but shielded by the segment Pb lip
      • MP: the diffuse background can be picked up the DBM but would be swamped by signal in the quartz of the MD.
    • CG: SAM PE yield comparable to what we had in PREX-2/CREX?
      • MP: we are seeing a little larger PE yield (7 in PREX-2/CREX), but the light guide is shorter.
    • DMeekins: Is there a way to disable the HV on the tubes on a fault?
      • CG: we can investigate the inclusion of an interlock for the HV mainframe and will get back to DM with the options available.
  • Concrete shielding change:
    • CG: request is made to simplify the procurement process. HD concrete purchasing is proving to be quite difficult and expensive
    • RW: side holes?
    • CG: will allow for 24h of dissent but otherwise this change is approved

Next step:

Attendance

Present:

  • Mark Pitt (Deputy Spokesperson, MOLLER-NSF Project Coordinator)
  • Ciprian Gal (L2 CAM: Infrastructure)
  • Klaus Dehmelt (Deputy DOE Project Manager)
  • David Armstrong (Elected Executive Board Member)
  • Mark Jones (Hall A Leader)
  • Ruben Fair (DOE Project Manager)
  • Carl Zorn (L2 CAM: Detectors)
  • Paul King (Working Group Convener: DAQ)
  • Dustin McNulty (Working Group Convener: Integrating Detectors)
  • Dave Meekins (L2 CAM: Target)
  • Robin Wines (Project Engineer)
  • Paul A Souder (Elected Executive Board Member)
  • Nilanga Liyanage (Working Group Convener: Tracking Detectors)


Technical board membership:

  • Kent Paschke, Chair (MOLLER Scientific Coordinator)
  • Krishna Kumar (MOLLER Spokesperson)
  • Michael Gericke (MOLLER-CFI Project Coordinator)
  • Juliette Mammei (Executive Board International Representative)
  • Mike Dion (L2 CAM: Spectrometer)
  • Robert Michaels (L2 CAM: DAQ)
  • Vladimir Berdnikov (L2 CAM: Installation)
  • Silviu Covrig (Working Group Convener: Target)
  • Caryn Palatchi (Working Group Convener: Polarized Beam)
  • Jim Napolitano (Working Group Convener: Polarimetry)
  • Rakitha Beminiwattha (Working Group Convener: Simulations)
  • Yury Kolomensky (Working Group Convener: Physics Extraction)