Difference between revisions of "CountingDaq 230428"

From Moller Wiki
Jump to: navigation, search
 
Line 22: Line 22:
  
 
==  Minutes ==
 
==  Minutes ==
Recording on Zoom:
+
Recording on Zoom: [https://jlab-org.zoomgov.com/rec/share/cUk4muZC0y1wY7Ia5SIojIDxelUschCkAFarqp8wUJt6C1m4-Xmt6Qw9Xd2ejOst.tl3yxVECDVKOA6gM?startTime=1682697354000]
 +
 
 +
Participants:  B. Moffitt, P. King, R. Michaels, D. Armstrong, S. Chatterjee, M. Gericke, D. McNulty
 +
 
 +
*  Paul:  I had reached out to Klaus about the VXS crate spec for setting up a GEM-to-VTP readout.  They don't have funds for the crate right now, so we'd probably need to loan one to them when we get to that point. 
 +
*  Discussion of the fiber run for the MPD readout.  We haven't had a definitive estimate for this fiber run.  This is probably 100m.  We expect this would be within the DAQ budget.
 +
*  Discussion of the fiber run for the HVMAPS.  Each of the 84 tiles will have a MTP connector (only 5 of the 12 fibers are used).  We should consider if we want to run 84 individual cables or use a higher-density trunk.
 +
*  Jie is working on the (hopefully) last redesign of the base+amplifiers.
 +
**  David will get in touch with Jie about what modifications are possible to use the amplifiers with the smaller PMTs for the pion detector
 +
*  I have a summer student (Ryan Conaway) who I plan to have working on the VTP triggering design
 +
**  Bryan can copy the library updates from NPS into the Compton test stand system
 +
**  Then Bryan can help Ryan and I get familiar with how to set up the VTP firmware

Latest revision as of 14:48, 12 May 2023

Back to Main Page >> Data Acquisition Meetings >> Counting mode DAQ meetings

previous meeting << >> following meeting

Meeting information

 Meeting time:  12:00pm Eastern
   
 Zoom connection information
 Join ZoomGov Meeting
 https://jlab-org.zoomgov.com/j/1603800887?pwd=aXVmSnN6aWZWN3RBdXB4RUhGckZJdz09
 
 Meeting ID: 160 380 0887
 Passcode: 903612
 US Tool free phone: (833) 568 8864
 Find your local number: https://jlab-org.zoomgov.com/u/ab8341cjcG

Agenda

  • Activity updates
  • General discussion


Minutes

Recording on Zoom: [1]

Participants: B. Moffitt, P. King, R. Michaels, D. Armstrong, S. Chatterjee, M. Gericke, D. McNulty

  • Paul: I had reached out to Klaus about the VXS crate spec for setting up a GEM-to-VTP readout. They don't have funds for the crate right now, so we'd probably need to loan one to them when we get to that point.
  • Discussion of the fiber run for the MPD readout. We haven't had a definitive estimate for this fiber run. This is probably 100m. We expect this would be within the DAQ budget.
  • Discussion of the fiber run for the HVMAPS. Each of the 84 tiles will have a MTP connector (only 5 of the 12 fibers are used). We should consider if we want to run 84 individual cables or use a higher-density trunk.
  • Jie is working on the (hopefully) last redesign of the base+amplifiers.
    • David will get in touch with Jie about what modifications are possible to use the amplifiers with the smaller PMTs for the pion detector
  • I have a summer student (Ryan Conaway) who I plan to have working on the VTP triggering design
    • Bryan can copy the library updates from NPS into the Compton test stand system
    • Then Bryan can help Ryan and I get familiar with how to set up the VTP firmware