Difference between revisions of "IntegrationDaq 210813"
From Moller Wiki
(Created page with "__NOTOC__ Back to Main Page >> Data Acquisition Meetings >> Integrating mode DAQ meetings In...") |
(→Agenda) |
||
Line 15: | Line 15: | ||
== Agenda == | == Agenda == | ||
+ | * Activity updates | ||
* General discussion | * General discussion | ||
+ | ** Should we keep the same meeting time through the Fall? | ||
=== Open Issues to be followed up later === | === Open Issues to be followed up later === | ||
Line 22: | Line 24: | ||
## ICD -- interface control document(s). -- apparently Robin Wines made a template and it's on sharepoint. It seems we need several of these (infrastructure to DAQ; detectors to DAQ, etc). | ## ICD -- interface control document(s). -- apparently Robin Wines made a template and it's on sharepoint. It seems we need several of these (infrastructure to DAQ; detectors to DAQ, etc). | ||
# Discussions with M. Pitt & J. Musson to understand the beam monitor signals we'll be getting | # Discussions with M. Pitt & J. Musson to understand the beam monitor signals we'll be getting | ||
− | |||
== Minutes == | == Minutes == |
Revision as of 14:32, 12 August 2021
Back to Main Page >> Data Acquisition Meetings >> Integrating mode DAQ meetings
previous meeting << >> following meeting
Meeting information
Meeting time: 3:30pm Eastern BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 Other BlueJeans access phone numbers are listed at https://www.bluejeans.com/premium-numbers Bluejeans CODE: 641 252 323 Bluejeans link: https://bluejeans.com/641252323
Agenda
- Activity updates
- General discussion
- Should we keep the same meeting time through the Fall?
Open Issues to be followed up later
- Need two things by end of August (no hard deadline). Some of this is just cut/paste from existing docs.
- Design requirements document -- examples and template : http://userweb.jlab.org/~rom/mollerdaq/design
- ICD -- interface control document(s). -- apparently Robin Wines made a template and it's on sharepoint. It seems we need several of these (infrastructure to DAQ; detectors to DAQ, etc).
- Discussions with M. Pitt & J. Musson to understand the beam monitor signals we'll be getting
Minutes
Recording on Bluejeans.com:
Participants: