Difference between revisions of "Technical Board Meeting July 30, 2024"
From Moller Wiki
(3 intermediate revisions by one other user not shown) | |||
Line 1: | Line 1: | ||
Back to [[Main_Page|Main Page]] >> [[Technical_Board | Technical Board]] | Back to [[Main_Page|Main Page]] >> [[Technical_Board | Technical Board]] | ||
− | [[Technical_Board_Meeting_Jun_11,_2024 | Technical Board Meeting June 11, 2024 ]] << >> | + | [[Technical_Board_Meeting_Jun_11,_2024 | Technical Board Meeting June 11, 2024 ]] << >> [[Technical_Board_Meeting_Sept_4,_2024 | Technical Board Meeting September 4, 2024 ]] |
Online: see email | Online: see email | ||
Line 7: | Line 7: | ||
=Agenda= | =Agenda= | ||
* Quartz and PMT purchases for ancillary detectors (Mark Pitt) [https://moller-docdb.physics.sunysb.edu/DocDB/0012/001293/001/Pitt_TBmeeting_jul_30_2024.pdf slides] | * Quartz and PMT purchases for ancillary detectors (Mark Pitt) [https://moller-docdb.physics.sunysb.edu/DocDB/0012/001293/001/Pitt_TBmeeting_jul_30_2024.pdf slides] | ||
− | * Concrete shielding of Upstream Torus region (Ciprian Gal) | + | * Concrete shielding of Upstream Torus region (Ciprian Gal) [https://moller-docdb.physics.sunysb.edu/cgi-bin/DocDBTest/private/ShowDocument?docid=1292 docDB1292] |
=Minutes= | =Minutes= | ||
Line 14: | Line 14: | ||
** MP: most of the components have been bought for other detectors in the experiment. | ** MP: most of the components have been bought for other detectors in the experiment. | ||
** MP: the SAMs will have different tubes; that have worked fine before in similar experimental settings | ** MP: the SAMs will have different tubes; that have worked fine before in similar experimental settings | ||
− | ** CG: spares? | + | ** CG: we will have spares for the PMTs? |
*** MP: counts already have spares in them | *** MP: counts already have spares in them | ||
** CG: DBM quartz position? Should it not be inside the segment? | ** CG: DBM quartz position? Should it not be inside the segment? | ||
Line 23: | Line 23: | ||
** DMeekins: Is there a way to disable the HV on the tubes on a fault? | ** DMeekins: Is there a way to disable the HV on the tubes on a fault? | ||
*** CG: we can investigate the inclusion of an interlock for the HV mainframe and will get back to DM with the options available. | *** CG: we can investigate the inclusion of an interlock for the HV mainframe and will get back to DM with the options available. | ||
− | + | ** CG: those present unanimously agreed to proceed with the procurement | |
* Concrete shielding change: | * Concrete shielding change: | ||
** CG: request is made to simplify the procurement process. HD concrete purchasing is proving to be quite difficult and expensive | ** CG: request is made to simplify the procurement process. HD concrete purchasing is proving to be quite difficult and expensive | ||
− | ** RW: side holes? | + | ** RW: were the side holes included in the US torus wall? |
− | ** CG: | + | *** CG: Zuhal included them in the simulation and the radiation field outside of the wall is not changed significantly so we are good to go with that change as well. |
+ | ** CG: 24h were allowed for people to bring up concerns. None were registered, and the all the attendees at the meeting agreed that this change makes sense. | ||
Next step: | Next step: |
Latest revision as of 15:08, 3 September 2024
Back to Main Page >> Technical Board
Technical Board Meeting June 11, 2024 << >> Technical Board Meeting September 4, 2024
Online: see email
Agenda
- Quartz and PMT purchases for ancillary detectors (Mark Pitt) slides
- Concrete shielding of Upstream Torus region (Ciprian Gal) docDB1292
Minutes
- Quartz and PMT purchases for aux sets:
- MP: request is approval for a large purchase for the auxiliary detectors
- MP: most of the components have been bought for other detectors in the experiment.
- MP: the SAMs will have different tubes; that have worked fine before in similar experimental settings
- CG: we will have spares for the PMTs?
- MP: counts already have spares in them
- CG: DBM quartz position? Should it not be inside the segment?
- MP: the quartz is radially in. It is detecting low flux things but it gets to the phototubes but shielded by the segment Pb lip
- MP: the diffuse background can be picked up the DBM but would be swamped by signal in the quartz of the MD.
- CG: SAM PE yield comparable to what we had in PREX-2/CREX?
- MP: we are seeing a little larger PE yield (7 in PREX-2/CREX), but the light guide is shorter.
- DMeekins: Is there a way to disable the HV on the tubes on a fault?
- CG: we can investigate the inclusion of an interlock for the HV mainframe and will get back to DM with the options available.
- CG: those present unanimously agreed to proceed with the procurement
- Concrete shielding change:
- CG: request is made to simplify the procurement process. HD concrete purchasing is proving to be quite difficult and expensive
- RW: were the side holes included in the US torus wall?
- CG: Zuhal included them in the simulation and the radiation field outside of the wall is not changed significantly so we are good to go with that change as well.
- CG: 24h were allowed for people to bring up concerns. None were registered, and the all the attendees at the meeting agreed that this change makes sense.
Next step:
Attendance
Present:
- Mark Pitt (Deputy Spokesperson, MOLLER-NSF Project Coordinator)
- Ciprian Gal (L2 CAM: Infrastructure)
- Klaus Dehmelt (Deputy DOE Project Manager)
- David Armstrong (Elected Executive Board Member)
- Mark Jones (Hall A Leader)
- Ruben Fair (DOE Project Manager)
- Carl Zorn (L2 CAM: Detectors)
- Paul King (Working Group Convener: DAQ)
- Dustin McNulty (Working Group Convener: Integrating Detectors)
- Dave Meekins (L2 CAM: Target)
- Robin Wines (Project Engineer)
- Paul A Souder (Elected Executive Board Member)
- Nilanga Liyanage (Working Group Convener: Tracking Detectors)
Technical board membership:
- Kent Paschke, Chair (MOLLER Scientific Coordinator)
- Krishna Kumar (MOLLER Spokesperson)
- Michael Gericke (MOLLER-CFI Project Coordinator)
- Juliette Mammei (Executive Board International Representative)
- Mike Dion (L2 CAM: Spectrometer)
- Robert Michaels (L2 CAM: DAQ)
- Vladimir Berdnikov (L2 CAM: Installation)
- Silviu Covrig (Working Group Convener: Target)
- Caryn Palatchi (Working Group Convener: Polarized Beam)
- Jim Napolitano (Working Group Convener: Polarimetry)
- Rakitha Beminiwattha (Working Group Convener: Simulations)
- Yury Kolomensky (Working Group Convener: Physics Extraction)